Tender Details
Particulars | Details |
---|---|
Title |
Bengaluru Salem Section : Construction Of Side Drain For A Length Of 1.5km In Connection With The Work Of Through Ballast Recoupment Of Points And Crossings At Dharmapuri (Dpj), Rayakottai (Ryc), Periya Naga Thunai (Prnt), Kelamangalam (Kmlm) And Banaswadi (Band) Yards Total 11 Nos. In Aden/Dpj Section . Maintenance Period Is 6 Months
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73243786 |
Reference Number |
02SBC24of25-01-24Item04 |
Tender Fee | 0 |
EMD | 2.16 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73243786/viewNitPdf_4461788.pdf |
Start Date | January 25, 2024 16:55 |
End Date |
19/02/2024 ( Expired 427 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreBengaluru-salem section : sw i : complete track renewal (p) of existing 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dharmapuri section. sw ii : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 22.0 km from km 23/000-45/000 (sl) in aden/dpj section. sw iii : complete track ren
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru-salem section : construction of officers rest house (orh) at dharmapuri (dpj) station in aden/dpj sub-division. sw ii : proposed provision of pay and use toilet at banaswadi (band), platform no. 1. maintenance period is 12 months
For complete deion and other details, please refer to tender
Read moreSw-i: bengaluru - salem sec: strengthening of bank by providing standard width in isolated locations for a length of 18.85km from km 145/650-165/600 sl in aden/dharmapuri section. sw-ii: bengaluru - salem sec: cess work in connection with the work of through ballast recoupment of points and crossings at dharmapuri (dpj), rayakkottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards-total 11 nos in aden/dharmapuri section. maintenance period is 6 months or one mo
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road section : proposed construction of rcc drain in connection with the work of through ballast recoupment of points and crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard (total 10 nos.,) . sw ii : bengaluru - sampige road sec : construction of balance retaining wall, approach road etc., of rub in lieu of lc-37 at km 64/200-300 in kyatsandra (kiat) station yard. sw iii : yelahanka - chintamani section : proposed improvement
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : pro. raising and extension of platform at palakkodu (pcv) station - 630m including ramp (extension of 70m at pf-1 and raising of 560m at pf-2 of pcv station) and marandahalli (mzu) station - 320m (extension of 160m each at pf-1 & 2) - total 950m. sw ii : bengaluru - salem sec : construction of boundary wall between chainage from 181/000 to 182/000 (lhs and rhs) for a length of 1500m in aden/dharmapuri section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : manufacturing, supply and stacking of machine crushed track ballast including leading and loading at periya naga thunai (prnt) depot (quantity = 21,150 cum) in connection with the work of (a) bengaluru-salem section : increasing sleeper density of existing 52kg psc sleepers of 1310/km to 1540/km for a length of 9.565km in loop lines of aden/dharmapuri, (b) chikka banavara - hassan section : through ballast recoupment of points and crossings at nelamangala (nmga) yard - 08 nos., (c) thro
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: sw-i: construction of rcc drain for a length of 1500m in connection with the work of through ballast recoupment of points and crossings at malur (mlo), devanagunthi (dkn), whitefield (wfd), whitefield panel cabin (whpc) and krishnarajapuram (kjm) yards - total 11 nos in sse/p.way/wfd section. maintenance period is 6months.
For complete deion and other details, please refer to tender
Read moreSw i : collection of ballast including leading and loading at periya naga thunai (prnt) depot in connection with the work of bengaluru - salem ctr(p) for a length of 16km from 11/900-23/000 and 72/100-77/000 sl to replace d mark rails . sw ii : bengaluru - salem section : collection of ballast including loading at periya naga thunai (prnt) ballast depot in connection with the work of through ballast recoupment for a length of 16.011km in looplines of aden/dharmapuri (dpj) sub
For complete deion and other details, please refer to tender
Read moreSw-i: bengaluru - dharmavaram section: increasing sleeper density of existing 52 kg psc sleepers of 1310/km to 1540/km for a length of 4.2 km in loop lines of sse/pway/yelahanka section [channasandra (csdr) : rd-1, rd-3 & rd-4, yelahanka (ynk) : rd-1 and rd-2 in sr den/north/sbc section]. sw-ii: bengaluru - sampige road section: through ballast recoupment of points & crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard - (total 10 nos). sw-iii: bengaluru - sa
For complete deion and other details, please refer to tender
Read moreof your Industry type