Tender Details
Particulars | Details |
---|---|
Title |
Irqp Work Of Ranchi Ring Road Sarwal Baredih Industrial Area Approach Road (Total Length 2.99 Km) For The Year 2025 26.
|
Description |
Irqp Work Of Ranchi Ring Road Sarwal Baredih Industrial Area Approach Road (Total Length 2.99 Km) For The Year 2025 26.
|
Organisation | RCD EinC | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 2.21 Lakh |
Tender Value | |
Place | Road-Sarwal-Baredih Industrial area approach road |
Link |
AAAAAAAAAA Login to view |
Start Date | May 16, 2025 00:10 |
End Date |
03/06/2025 ( 17 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreFabrication erection and dismantling work of pipe and fitting etc for year 2025 26
Fabrication erection and dismantling work of pipe and fitting etc for year 2025 26
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreUp-keep of plant area and equipments in urea plant for the year 2025-26
Up-keep of plant area and equipments in urea plant for the year 2025-26
Read moreImprovement of b.t road and drain from hanuman mandir to kashinath sahoo house via- new colony in ward no-12 for the year 2025-26
Improvement of b.t road and drain from hanuman mandir to kashinath sahoo house via- new colony in ward no-12 for the year 2025-26
Read moreCleaning of underground drainage pipeline in cantt area adjacent to yodha marg, mathura cantt. for the financial year 2025-26
Cleaning of underground drainage pipeline in cantt area adjacent to yodha marg, mathura cantt. for the financial year 2025-26
Read moreBarala more to melatala at mondalpur adibasipara road of chainage 0.00km to3.55km(excluding mastic portion) surfacing work under berhampore division no-i pwd in the district of murshidabad during the year 2025-26.
Barala more to melatala at mondalpur adibasipara road of chainage 0.00km to3.55km(excluding mastic portion) surfacing work under berhampore division no-i pwd in the district of murshidabad during the year 2025-26.
Read moreof your Industry type