Tender Details

Particulars Details
Title
Construction Of Dhobinpurwa Link Road In Km. 1 And 2 (50) Under Rajya Sadak Nidhi Yojna In Financial Year 2025 26 With 05 Year Maintenance.
Description
Construction Of Dhobinpurwa Link Road In Km. 1 And 2 (50) Under Rajya Sadak Nidhi Yojna In Financial Year 2025 26 With 05 Year Maintenance.
Organisation Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT
Tender Id 2026_CEDPW_1123361_1
Reference
Number
864/8 Kam/e_Tendering/BRH-SWT Circle/2025-26 Dated - 27-02-2026
Tender Fee 2715
EMD 5.9 Lakh
Tender Value
Place Bahraich
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2092760

Start Date March 11, 2026 17:30
End Date
Expired 18/03/2026

Expired 127 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Construction of dariyaonpurwa link road in km.-1 and 2(50) under rajya sadak nidhi yojna in financial year 2025-26 with 05 year maintenance.

Construction of dariyaonpurwa link road in km.-1 and 2(50) under rajya sadak nidhi yojna in financial year 2025-26 with 05 year maintenance.

Read more
Construction of loharanpurwa link road in km.-1 and 2(600) under rajya sadak nidhi yojna in financial year 2025-26 with 05 year maintenance.

Construction of loharanpurwa link road in km.-1 and 2(600) under rajya sadak nidhi yojna in financial year 2025-26 with 05 year maintenance.

Read more
Special repair of malhipur kala link road km.-1 and 2 under rajya sadak nidhi yojna year 2025-26 in district shravasti.

Special repair of malhipur kala link road km.-1 and 2 under rajya sadak nidhi yojna year 2025-26 in district shravasti.

Read more
Construction of chamarpurwa ki basawat mathurapurwa link road km.-1(500) in rajya sadak nidi yojna in year 2025-26 in district-shrawasti. (05 years maintenance)

Construction of chamarpurwa ki basawat mathurapurwa link road km.-1(500) in rajya sadak nidi yojna in year 2025-26 in district-shrawasti. (05 years maintenance)

Read more
Construction of bichala to tiwaripurwa missing link road in km.-1 (700) under rajya sadak nidhi yojna in financial year 2024-25.

Construction of bichala to tiwaripurwa missing link road in km.-1 (700) under rajya sadak nidhi yojna in financial year 2024-25.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise