Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Dhobinpurwa Link Road In Km. 1 And 2 (50) Under Rajya Sadak Nidhi Yojna In Financial Year 2025 26 With 05 Year Maintenance.
|
| Description |
Construction Of Dhobinpurwa Link Road In Km. 1 And 2 (50) Under Rajya Sadak Nidhi Yojna In Financial Year 2025 26 With 05 Year Maintenance.
|
| Organisation | Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT |
| Tender Id | 2026_CEDPW_1123361_1 |
|
Reference Number |
864/8 Kam/e_Tendering/BRH-SWT Circle/2025-26 Dated - 27-02-2026 |
| Tender Fee | 2715 |
| EMD | 5.9 Lakh |
| Tender Value | |
| Place | Bahraich |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2092760 |
| Start Date | March 11, 2026 17:30 |
| End Date |
Expired
18/03/2026
Expired 127 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of dariyaonpurwa link road in km.-1 and 2(50) under rajya sadak nidhi yojna in financial year 2025-26 with 05 year maintenance.
Construction of dariyaonpurwa link road in km.-1 and 2(50) under rajya sadak nidhi yojna in financial year 2025-26 with 05 year maintenance.
Read moreConstruction of loharanpurwa link road in km.-1 and 2(600) under rajya sadak nidhi yojna in financial year 2025-26 with 05 year maintenance.
Construction of loharanpurwa link road in km.-1 and 2(600) under rajya sadak nidhi yojna in financial year 2025-26 with 05 year maintenance.
Read moreSpecial repair of malhipur kala link road km.-1 and 2 under rajya sadak nidhi yojna year 2025-26 in district shravasti.
Special repair of malhipur kala link road km.-1 and 2 under rajya sadak nidhi yojna year 2025-26 in district shravasti.
Read moreConstruction of chamarpurwa ki basawat mathurapurwa link road km.-1(500) in rajya sadak nidi yojna in year 2025-26 in district-shrawasti. (05 years maintenance)
Construction of chamarpurwa ki basawat mathurapurwa link road km.-1(500) in rajya sadak nidi yojna in year 2025-26 in district-shrawasti. (05 years maintenance)
Read moreConstruction of bichala to tiwaripurwa missing link road in km.-1 (700) under rajya sadak nidhi yojna in financial year 2024-25.
Construction of bichala to tiwaripurwa missing link road in km.-1 (700) under rajya sadak nidhi yojna in financial year 2024-25.
Read moreof your Industry type