Mtps I Ca Cws I Renewal Of The Existing Damaged Pvc Fills With New Fills Rearranging The Hanging Fills Along With Ss Grp Grid In Cooling Tower I During Aoh 2025 2026 Of Unit I
|
Description |
Mtps I Ca Cws I Renewal Of The Existing Damaged Pvc Fills With New Fills Rearranging The Hanging Fills Along With Ss Grp Grid In Cooling Tower I During Aoh 2025 2026 Of Unit I
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 3300 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link |
AAAAAAAAAA Login to view |
Start Date | May 12, 2025 16:30 |
End Date |
26/05/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i ca cws i fabrication of stop log gate 2 nos to provide in outlet canal of unit i cooling tower
Mtps i ca cws i fabrication of stop log gate 2 nos to provide in outlet canal of unit i cooling tower
Read moreMtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Read moreMtps i tm unit i replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2025 26
Mtps i tm unit i replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2025 26
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreMtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Mtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Read moreMtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Read moreTtps mech ii bm matching of new coal nozzles with coal nozzle tips available at store to use in unit i boiler during 2025 2026 overhaul
Ttps mech ii bm matching of new coal nozzles with coal nozzle tips available at store to use in unit i boiler during 2025 2026 overhaul
Read moreMtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii
Mtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii
Read moreMtps i ca cws ii overhauling of existing id fan gearbox for 5 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower stage ii
Mtps i ca cws ii overhauling of existing id fan gearbox for 5 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower stage ii
Read moreWork contract for restoration replacement of damaged pvc fill blocks supporting ss pipes and ss hangers etc of cooling tower no iii during shutdown in 02 2025
Work contract for restoration replacement of damaged pvc fill blocks supporting ss pipes and ss hangers etc of cooling tower no iii during shutdown in 02 2025