Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I M I Ca Cws I Cooling Tower Ii Overhauling Of Flow Control Valves And Including Reconditioning Of Released Fcv Spares During Aoh 2026 2027 Of Unit Ii
|
| Description |
Mtps I M I Ca Cws I Cooling Tower Ii Overhauling Of Flow Control Valves And Including Reconditioning Of Released Fcv Spares During Aoh 2026 2027 Of Unit Ii
|
| Organisation | TNEB Limited | TANGEDCO | CE-MTPS-I - TANGEDCO | SE-Mechanical Maintenance I-MTPS-I - TANGEDCO |
| Tender Id | 2026_EB_710390_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / CA /OT.118/ 2026 -27 |
| Tender Fee | - |
| EMD | 5200 |
| Tender Value | - |
| Place | Tamil Nadu |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=Home&service=page |
| Start Date | October 01, 2026 23:50 |
| End Date |
Expired
15/10/2026
Expired 1 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Mtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Read moreTtps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Read moreTtps mechii tm i unitiii reconditioning of lub oil seal oil cooler cooling water butterfly gate valves of various sizes during the forthcoming annual overhaul
Ttps mechii tm i unitiii reconditioning of lub oil seal oil cooler cooling water butterfly gate valves of various sizes during the forthcoming annual overhaul
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit power house equipment, contract for reconditioning/servicing of different types and sizes of valves for tg aux area unit#8, 500 mw, mtps as per sow & atc
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit power house equipment, contract for reconditioning/servicing of different types and sizes of valves for tg aux area unit#8, 500 mw, mtps as per sow & atc
Read moreMtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2025 2026 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2025 2026 of unit ii
Read moreMtps i ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2024 2025 of unit i
Mtps i ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2024 2025 of unit i
Read moreMtps i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of worn out spares during aoh 2023 2024 of unit ii
Mtps i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of worn out spares during aoh 2023 2024 of unit ii
Read moreof your Industry type