Tender Details

Particulars Details
Title
Mtps I M I Ca Cws I Cooling Tower Ii Overhauling Of Flow Control Valves And Including Reconditioning Of Released Fcv Spares During Aoh 2025 2026 Of Unit Ii
Description
Mtps I M I Ca Cws I Cooling Tower Ii Overhauling Of Flow Control Valves And Including Reconditioning Of Released Fcv Spares During Aoh 2025 2026 Of Unit Ii
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_623382_1
Reference
Number
CE / MTPS-I / SE / M-I / CA /OT. 381 / 2025 -26
Tender Fee 0
EMD 6000
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=745392

Start Date November 14, 2025 18:30
End Date
Expired 28/11/2025

Expired 318 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii

Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii

Read more
Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii

Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii

Read more
Mtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27

Mtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27

Read more
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Read more
Mtps i bm unit ii boiler pressure parts aoh 2026 overhauling of hp lp valves and replacement of defective valves

Mtps i bm unit ii boiler pressure parts aoh 2026 overhauling of hp lp valves and replacement of defective valves

Read more
Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc

Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc

Read more
Mtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27

Mtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27

Read more
Mtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems

Mtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems

Read more
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works

Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works

Read more
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise