Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I M I Ca Cws I Cooling Tower Ii Overhauling Of Flow Control Valves And Including Reconditioning Of Released Fcv Spares During Aoh 2025 2026 Of Unit Ii
|
| Description |
Mtps I M I Ca Cws I Cooling Tower Ii Overhauling Of Flow Control Valves And Including Reconditioning Of Released Fcv Spares During Aoh 2025 2026 Of Unit Ii
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_623382_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / CA /OT. 381 / 2025 -26 |
| Tender Fee | 0 |
| EMD | 6000 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=745392 |
| Start Date | November 14, 2025 18:30 |
| End Date |
Expired
28/11/2025
Expired 318 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Read moreMtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii
Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii
Read moreMtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27
Mtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 overhauling of hp lp valves and replacement of defective valves
Mtps i bm unit ii boiler pressure parts aoh 2026 overhauling of hp lp valves and replacement of defective valves
Read moreMtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Read moreMtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27
Mtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27
Read moreMtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Mtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works
Read moreMtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Read moreof your Industry type