Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏭 Tender Announcement For Overhauling Of Flow Control Valve At Mettur Thermal Power Station I 🚫💧 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Overhauling Of The Flow Control Valve Complete Assembly And Renewal Of Its Worn Out Components In Cooling Tower Iii Of Stage Ii During The Annual Overhauling Hours (Aoh) 2024 25 At Mettur Thermal Power Station I, Mettur Dam. 📅 Bid Submission Deadline: April 26, 2024, 2:00 Pm Tender Fee: Inr 0 Emd: Inr 1300 Interested Bidders Must Possess The Necessary Technical Expertise And Experience In Handling Such Overhauling Projects Within Power Stations. Detailed Bids Should Encompass Technical Specifications, Pricing, And A Timeline For Completion, Ensuring Compliance With All Safety And Quality Standards. Keywords: Tneb Limited, Power Station, Overhauling, Flow Control Valve, Cooling Tower, Aoh, State Government Undertaking, Renewal, Bid, TenderParticulars | Details |
---|---|
Title |
Mtps I Ca Cws Ii Overhauling Of Flow Control Valve Complete Assembly Renewal Of Its Worn Out Components In Cooling Tower Iii Of Stage Ii During Aoh 2024 25
|
Description |
Mtps I Ca Cws Ii Overhauling Of Flow Control Valve Complete Assembly Renewal Of Its Worn Out Components In Cooling Tower Iii Of Stage Ii During Aoh 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_426250_1 |
Reference Number |
CE /MTPS-I / SE / M-I /CA / OT. 421/2023-24 |
Tender Fee | 0 |
EMD | 1300 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=537140 |
Start Date | April 20, 2024 22:30 |
End Date |
26/04/2024 ( Expired 433 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Read moreDesilting, cleaning, dewatering and associated works of c.t. basin of cooling tower/forebay of 6x250mw, stps (stage-i, ii, iii, and iv) unit- 1 to 6.
Desilting, cleaning, dewatering and associated works of c.t. basin of cooling tower/forebay of 6x250mw, stps (stage-i, ii, iii, and iv) unit- 1 to 6.&#x0d &#x0d
Read moreTtps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Read moreNctps i se m ii circle echs dn overhauling and reconditioning of worn out failed rotating assembly complete for fluidomat make fluid coupling model sc 12 released from the conveyor bcn 40b
Nctps i se m ii circle echs dn overhauling and reconditioning of worn out failed rotating assembly complete for fluidomat make fluid coupling model sc 12 released from the conveyor bcn 40b
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Read moreNctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Nctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Read moreNctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Nctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Read moreMtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Mtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Read moreof your Industry type