Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Ca Cws Ii Unit Iv Erection Of Sunshield Roof Truss With Powder Coated Roofing Sheet Over Western Side Of Cooling Tower Iv During Aoh 2025 26
|
| Description |
Mtps I Ca Cws Ii Unit Iv Erection Of Sunshield Roof Truss With Powder Coated Roofing Sheet Over Western Side Of Cooling Tower Iv During Aoh 2025 26
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_589285_1 |
|
Reference Number |
CE/MTPS-I/SE/M-I/CA/OT.220 /2025-26 |
| Tender Fee | 0 |
| EMD | 16300 |
| Tender Value | |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=703968 |
| Start Date | August 05, 2025 21:30 |
| End Date |
Expired
11/08/2025
Expired 311 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication supply of sun shield roof truss with structural material and powder coated roof sheet over the western side of the hot water basin of cooling tower unit iv
Fabrication supply of sun shield roof truss with structural material and powder coated roof sheet over the western side of the hot water basin of cooling tower unit iv
Read moreMtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2025 2026 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2025 2026 of unit ii
Read moreMtps i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of worn out spares during aoh 2023 2024 of unit ii
Mtps i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of worn out spares during aoh 2023 2024 of unit ii
Read moreMtps i ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2024 2025 of unit i
Mtps i ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2024 2025 of unit i
Read moreMtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Read moreMtps i ca cws i cooling tower i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2024 2025 of unit i
Mtps i ca cws i cooling tower i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2024 2025 of unit i
Read moreMtps i m i ca cws i strengthening and reconditioning of western side eroded corroded sun shield roof structure and its doors provided over hot water basin in cooling tower ii and allied works
Mtps i m i ca cws i strengthening and reconditioning of western side eroded corroded sun shield roof structure and its doors provided over hot water basin in cooling tower ii and allied works
Read moreMtps i m i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2025 26
Mtps i m i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2025 26
Read moreMtps i ca cws ii overhauling of flow control valve complete assembly and renewal of its worn out components in cooling tower iv of stage ii during aoh 2024 25
Mtps i ca cws ii overhauling of flow control valve complete assembly and renewal of its worn out components in cooling tower iv of stage ii during aoh 2024 25
Read moreMtps i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of worn out spares during coh 2024 2025 of unit ii
Mtps i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of worn out spares during coh 2024 2025 of unit ii
Read moreof your Industry type