Tender Details
Particulars | Details |
---|---|
Title |
Construction And Laying Of Tiles In Office Building With Water Proofing And Electrification Work On Sundry Shop In Krishi Upaj Upmandi Panagar Distt Jabalpur
|
Description |
Construction And Laying Of Tiles In Office Building With Water Proofing And Electrification Work On Sundry Shop In Krishi Upaj Upmandi Panagar Distt Jabalpur
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2024_MPSAM_324101_1 |
Reference Number |
2024_MPSAM_324101_1 |
Tender Fee | 2000 |
EMD | 33100 |
Tender Value | |
Place | jabalpur |
Link | https://mptenders.gov.in |
Start Date | January 04, 2024 23:00 |
End Date |
29/01/2024 ( Expired 500 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreLaying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreConstruction work of 132kv gss rpl nagar and baneda (distt.-bhilwara) along with its associated lines and bay
Construction work of 132kv gss rpl nagar and baneda (distt.-bhilwara) along with its associated lines and bay
Read moreRain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreConstruction of new building (3 storied) of tripura government press with modern facilities under ga (printing and stationary) department, agartala, west tripura
Sh- building portion including internal water supply, sanitary installation, sewage and drainage work including internal electrification works.
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreof your Industry type