Tender Details

Particulars Details
Title
Mangalam Project Cs Vdy Engaging Labour For Water Distribution Along Lbmc Between Ch 5 400 Km To 23 400 Km And Its Distributaries
Description
Mangalam Project&Amp#X0d Cs Vdy Engaging Labour For Water Distribution&Amp#X0d Along Lbmc Between Ch 5 400 Km To 23 400&Amp#X0d Km And Its Distributaries
Organisation Irrigation Department | State Govt. and UT
Tender Id 2024_Irrig_694828_1
Reference
Number
7-IRR/PI/TR/3023/2024_5_6_5/1 The
Tender Fee 555
EMD 3341
Tender Value
Place ALATHUR
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1093318
Start Date October 26, 2024 22:30
End Date

30/10/2024 ( Expired 210 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.

Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Supply, erection, testing , commissioning for augmentation from 250 kva to 400 kva substation along with replacement of conductor with lt ab cable and installation of 11kv ct/pt (15/5amp) at nowabad fish fram, under the jurisdiction of electric di

Supply, erection, testing and commissioning for augmentation from 250 kva to 400 kva substation along with replacement of conductor with lt ab cable and installation of 11kv ct pt (15 5amp) at nowabad fish fram, under the jurisdiction of electric

Read more
General- one time maintenance 2024-25-attingal town bypass in kadambattukonam - kazhakuttom section of nh-66 - length - 10.6 km - from manamboor ch.527/500 to mamom ch.538/100

This work is for otm works in attingal town bypass in kadambattukonam - kazhakuttom section of nh-66, from manamboor ch.527/500 to mamom ch.538/10, for a length of 10.60 km. and the work includes items such as wmm, dgbm, bc, traffic safety works etc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise