Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mangalam Project Cs Vdy Engaging Labour For Water Distribution Along Lbmc Between Ch 5 400 Km To 23 400 Km And Its Distributaries
|
Description |
Mangalam Project&Amp#X0d
Cs Vdy Engaging Labour For Water Distribution&Amp#X0d
Along Lbmc Between Ch 5 400 Km To 23 400&Amp#X0d
Km And Its Distributaries
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_694828_1 |
Reference Number |
7-IRR/PI/TR/3023/2024_5_6_5/1 The |
Tender Fee | 555 |
EMD | 3341 |
Tender Value | |
Place | ALATHUR |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1093318 |
Start Date | October 26, 2024 22:30 |
End Date |
30/10/2024 ( Expired 236 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreDifferent work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.
Different work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreProviding and engaging unskilled labour for recording approach channel water level at intake and informing to control room at ph i, 3x105mw thc mppgcl sirmour
Providing and engaging unskilled labour for recording approach channel water level at intake and informing to control room at ph i, 3x105mw thc mppgcl sirmour
Read moreP/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 18.00 to km 39.388 (waste shredded plastic to be used for 5 km length) on rd chandel-sugnu-chakpikarong under 84 rcc/25 brtf (p) sewak in manipur state
P/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 18.00 to km 39.388 (waste shredded plastic to be used for 5 km length) on rd chandel-sugnu-chakpikarong under 84 rcc/25 brtf (p) sewak in manipur state
Read moreof your Industry type