Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kpip Monsoon Preparedness Urgent Work During Monsoon For The Year 2023 24 Between Ch 42/000km To Ch 52/000km Of Lbmc And Its Distributaries
|
| Description |
Kpip Monsoon Preparedness Urgent Work During Monsoon For The Year 2023 24 Between Ch 42/000km To Ch 52/000km Of Lbmc And Its Distributaries
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_592996_1 |
|
Reference Number |
IRR/PI/TR/5660/2023_5_1_1/1 |
| Tender Fee | 555 |
| EMD | 2226 |
| Tender Value | |
| Place | Ottapalam |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | August 05, 2023 22:30 |
| End Date |
Expired
23/08/2023
Expired 1039 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance and upkeeping of archaeological gardens under aizawl circle, aizawl (in the states of tripura and manipur) for the period from july, 2026 to march, 2027 during the financial year 2026-27
Annual maintenance and upkeeping of archaeological gardens under aizawl circle, aizawl (in the states of tripura and manipur) for the period from july 2026 to march 2027 during the financial year 2026-27
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreWork of repair/replacement of damaged poles, wires, transformers due to natural calamities during the edsd-iiird, chakiya under 33/11kv naugarh, chakarghatta, jogeshwarnath, chakiya tehsil and chakiya grain edd-ist, chandauli.
Work of repair/replacement of damaged poles, wires, transformers due to natural calamities during the edsd-iiird, chakiya under 33/11kv naugarh, chakarghatta, jogeshwarnath, chakiya tehsil and chakiya grain edd-ist, chandauli.
Read moreSupply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Supply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Read moreDay to day operation of pump motor and controlling valves to ensure the day after day water supply for&#x0d better patient care service at sskmh campus, snph, pg polyclinic, ramrik das haralalka hospital and&#x0d kph_ipgmer during fy 2026-27.
Read moreRepairing work of 02(two) nos toilets in 02(two) nos schools in tilla bari model eng. med. jb school and jumia colony eng. med. jb school under kathalia and nalchar rd blocks of sepahijala district for the year 2026-27(2nd call).
Repairing work of 02(two) nos toilets in 02(two) nos schools in tilla bari model eng. med. jb school and jumia colony eng. med. jb school under kathalia and nalchar rd blocks of sepahijala district for the year 2026-27(2nd call).
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreAnnual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Annual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Read moreKpip monsoon preparedness emergency works between ch 23/000km and ch 33/000km and its distributaries during monsoon for the year 2023 24
Kpip monsoon preparedness emergency works between ch 23/000km and ch 33/000km and its distributaries during monsoon for the year 2023 24
Read moreMonsoon preparedness kpip urgent work during monsoon for the year 2023 24 between ch 52/000km to 61/700km
Monsoon preparedness kpip urgent work during monsoon for the year 2023 24 between ch 52/000km to 61/700km
Read moreof your Industry type