Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mangalam Project Cs Vdy Engaging Labour For Water Distribution Along Rbmc Between Ch10 800 Km To 21 515 Km And Its Distributaries
|
Description |
Mangalam Project&Amp#X0d
Cs Vdy Engaging Labour For Water Distribution&Amp#X0d
Along Rbmc Between Ch10 800 Km To&Amp#X0d
21 515 Km And Its Distributaries
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_694777_1 |
Reference Number |
6-IRR/PI/TR/3023/2024_5_5_4/1 |
Tender Fee | 555 |
EMD | 3341 |
Tender Value | |
Place | ALATHUR |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1093355 |
Start Date | October 26, 2024 22:30 |
End Date |
30/10/2024 ( Expired 236 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreDifferent work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.
Different work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.
Read moreProviding and engaging unskilled labour for recording approach channel water level at intake and informing to control room at ph i, 3x105mw thc mppgcl sirmour
Providing and engaging unskilled labour for recording approach channel water level at intake and informing to control room at ph i, 3x105mw thc mppgcl sirmour
Read moreTo engage 65 insulated vehicles along with driver and load men for collection of milk sachets from madhavaram ambattur sholinganallur dairies and distribution
To engage&#x0d 65 insulated vehicles along with driver and load men&#x0d for collection of milk sachets from madhavaram &#x0d ambattur sholinganallur dairies and distribution
Read moreTo engage 143 insulated vehicles along with driver load men for collection of milk sachets from madhavaram ambattur sholinganallur dairies and distribution
To engage&#x0d 143 insulated vehicles along with driver load men for&#x0d collection of milk sachets from madhavaram &#x0d ambattur sholinganallur dairies and distribution
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreSupply and stacking of stone boulders, smetal 40 mm, schips 20 mm, 10 mm, and sand for pmt works and smetal 63 mm, 45 mm, 26.5 mm, s/chips 13.2 mm, 6.7 mm and sand for surf work for bp-160 between km 0.000 to 10.000 in the state arunachal pradesh
Supply and stacking of stone boulders, smetal 40 mm, schips 20 mm, 10 mm, and sand for pmt works and smetal 63 mm, 45 mm, 26.5 mm, s/chips 13.2 mm, 6.7 mm and sand for surf work for bp-160 between km 0.000 to 10.000 in the state arunachal pradesh
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read morePrequalification of consultant for preparation of detailed project report (dpr) and/ or for project management consultant (pmc) for water supply systems in towns of beyla, koubia, and fria in guinea
Prequalification of consultants for drinking water supply systems in towns of beyla, koubia, and fria project in guinea involving water intake, storage, treatment, pumping and onwards distribution to households
Read moreof your Industry type