Tender Details
Particulars | Details |
---|---|
Title |
General Psm 2023 24 Improvement Works To Mudikkode Branch Canal Between Ch. 0/800 To 0/950 Km And Ch. 2/800 To 3/100 Km General Civil Work
|
Description |
General Psm 2023 24 Improvement Works To Mudikkode Branch Canal Between Ch. 0/800 To 0/950 Km And Ch. 2/800 To 3/100 Km General Civil Work
|
Organisation | Government of Kerala |
Tender Id | 2023_Irrig_598075_1 |
Reference Number |
IRR/IA/TR/2734/2023_5_11_10/1 |
Tender Fee | 2760 |
EMD | 42361 |
Tender Value | |
Place | Irrigation Division Thrissur |
Link | https://etenders.kerala.gov.in |
Start Date | August 23, 2023 21:30 |
End Date |
31/08/2023 ( Expired 649 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreUnder chinhat second ward vikalp khand, improvement work by paver finisher of road around the park from m.no. 3/93 to 3/207, 3/194n, 3/215, 3/421 to 3/412, 3/406 to 3/400, 3/423 to 3/376 and 2/178 and from 1/5 to 1/9.
Under chinhat second ward vikalp khand, improvement work by paver finisher of road around the park from m.no. 3/93 to 3/207, 3/194n, 3/215, 3/421 to 3/412, 3/406 to 3/400, 3/423 to 3/376 and 2/178 and from 1/5 to 1/9.
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreG e n e r a l - a n n u a l p l a n 2 0 2 4 - 2 5 modernization of departmental laboratories strengthening of bmfc-construction of boundary wall, sales er and security guard room-general civil work
G e n e r a l - a n n u a l p l a n 2 0 2 4 - 2 5&#x0d modernization of departmental laboratories&#x0d strengthening of bmfc-construction of&#x0d boundary wall, sales er and security guard&#x0d room-general civil work
Read moreC/o paprola to uttrala road km 0/00 to 12/00 (improvement of black spot)
Formation cutting in earth work 10/900 to 10/940 and r/wall at rd 10/910 to 10/925 and 11/00 to 11/040 and crash barrier for improvement of black spot
Read moreGeneral- one time maintenance 2024-25-attingal town bypass in kadambattukonam - kazhakuttom section of nh-66 - length - 10.6 km - from manamboor ch.527/500 to mamom ch.538/100 - general civil work
This work is proposed for the otm works in attingal town bypass of nh-66, from manamboor ch.527/500 to mamom ch.538/10, for a length of 10.60 km.
Read moreof your Industry type