Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ee/Ii/Nit19/2023 24
|
Description |
Replacement Of Old And Polluted Pipe Lines From Sunder Singh Bhander Ohsr To Raika Bera Magra Under Jurisdiction City Sub Division Lalsagar Ii
|
Organisation | Government of Rajasthan |
Tender Id | 2023_PHCJO_358120_1 |
Reference Number |
EE/II/NIT19/2023-24 |
Tender Fee | 1000 |
EMD | 1.66 Lakh |
Tender Value | |
Place | EE PHED CITY DIV II JODHPUR |
Link | https://eproc.rajasthan.gov.in |
Start Date | August 12, 2023 23:30 |
End Date |
22/08/2023 ( Expired 668 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair / replacement of water pipe line from over head reservoir to various location at rimc dehradun under ge dehradun
Repair / replacement of water pipe line from over head 
 reservoir to various location at rimc dehradun under ge dehradun
Read moreRepair/ cleaning of sewage lines, manholes, septic tanks, soakwell and repair/ replacement of gate, repair to compound wall, path, drain, fencing, culvert, garbage bins, sheds and other misc work in otm and md accn in zone-vi under age b/r-iv of ge
Repair/ cleaning of sewage lines, manholes, septic tanks, soakwell and repair/ replacement of gate, repair to compound wall, path, drain, fencing, culvert, garbage bins, sheds and other misc work in otm and md accn in zone-vi under age b/r-iv of ge
Read more8706 repairs replacement of sewage lines manholes and day to day complaints of otm and md accn under age br iii of ge south pune
8706 repairs replacement of sewage lines manholes and day to day complaints of otm and md accn under age br iii of ge south pune
Read moreRepairs/replacement of roof treatment, parapets alongwith allied repair works including periodical services and non structural repairs, repairs to vertical stacks, removal of plants/vegetation, external periodicals in old nsb under age b/r-i
Repairs/replacement of roof treatment, parapets
 alongwith allied repair works including
 periodical services and non structural repairs,
 repairs to vertical stacks, removal of
 plants/vegetation, external periodicals in old nsb
 under age b/r-ii
Read moreIndependent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Read moreRepair improvement of existing water pipe line and replacement of defective di ci gi pipe lines and other connected work and cleaning of under ground over head water reservoir ug sumps and swt including connected works in naval armament ns karanja
Repair improvement of existing water pipe line and replacement of defective di ci gi pipe lines and other connected work and cleaning of under ground over head water reservoir ug sumps and swt including connected works in naval armament ns karanja
Read moreRepairs/ replacement of worn out pipe lines of water supply distribution system at hq saw, hq sott, dmr, mh, otm accn, md accn and various locations and adjacent area of acc and s under ge(n) ahilyanagar
Repairs/ replacement of worn out pipe lines of water supply distribution system at hq saw, hq sott, dmr, mh, otm accn, md accn and various locations and adjacent area of acc and s under ge(n) ahilyanagar
Read moreReplacement of old pipe line
Replacement of old pipe line from chidiyatapu pump house to selvam shop and up to forest tank at chidiyatapu under beodnabad section sub division no iii phed
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreRepairs of pump sets including replacement of pipe lines, valves and other connected accessories at yph pump house and filteration plant under age e/m-1 at ge (central) khadki.
Repairs of pump sets including replacement of pipe lines, valves and other connected accessories at yph pump house and filteration plant under age e/m-1 at ge (central) khadki.
Read moreof your Industry type