Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mldt/K Ii/E02/Mgp/2023 2024 Sl 10
|
Description |
Construction Cc Road From Sahimuddin To Rubi House At D/Munsitola Under Mothabari G P Kaliachak Ii Dev Block Malda
|
Organisation | Government of West Bengal |
Tender Id | 2023_ZPHD_576103_10 |
Reference Number |
MLDT/K-II/E02/MGP/2023-2024 |
Tender Fee | 250 |
EMD | 2040 |
Tender Value | |
Place | MOTHABARI GRAM PANCHAYAT |
Link | https://wbtenders.gov.in |
Start Date | September 23, 2023 17:30 |
End Date |
06/10/2023 ( Expired 619 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConstruction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Read moreConstruction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Read moreAAAAAAAAAA
Login to viewConstruction of 2-laning with hard shoulder of peren-dimapur section of nh- 129a from design km 173.850 to km 190.850 (length - 17.000 km) in the state of nagaland on epc mode (package-v) under nh (o)-tsp
Read moreConsultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Read moreSpecial repairs to type iii qtr block no p 22 at cqa ee residential complex, aundh camp under ge mh and rh khadki
Special repairs to type iii qtr block p 22 at cqa ee residential complex aundh camp under ge mh and rh khadki
Read moreConstruction of mipi-andrathang road from km 20.000 to 50.000
Construction of mipi-andrathang road from km 20.000 to 50.000
 (design length 34.880 km between km 20.000 to 54.880)green field
 alignment to nhsl specifications in the aor of 62 rcc under 752 brtf
 of project udayak in arunachal pradesh state
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreof your Industry type