Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nhidcl/Civil Work /Nagaland/P D/Pkg5/2020
|
| Description |
Construction Of 2 Laning With Hard Shoulder Of Peren Dimapur Section Of Nh 129 A From Design Km 173.850 To Km 190.850 (Length 17.000 Km) In The State Of Nagaland On Epc Mode (Package V) Under Nh (O) Tsp
|
| Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
| Tender Id | 2025_NHIDC_864082_1 |
|
Reference Number |
NHIDCL/CivilWork /Nagaland/P-D/Pkg5/2020 |
| Tender Fee | 23600 |
| EMD | 1.77 Crore |
| Tender Value | - |
| Place | Nagaland |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=908427 |
| Start Date | July 18, 2025 16:30 |
| End Date |
Expired
19/08/2025
Expired 425 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of uni-directional sudhmahadev -dranga twin tube tunnels and its approach roads on chenani - sudhmahadev - goha section of nh-244 in the union territory of jammu and kashmir on epc mode
Read moreConstruction of boundary wall at pangin site office campus under sdsd,cwc,pasighat arunachal pradesh during 2026-27
Read moreEmergent maintenance of the existing road of the project construction of 2 laning with hard shoulder of ukhrul tolloi tadubi section of nh 102a from design chainage km 81.870 to km 105.825 pkg 4 at the risk and cost of the epc contractor 3rd call
Read moreConstruction of 4 lane twin tube road cum rail underwater tunnel under river brahmaputra, including 4 lane approaches along with provision of railway infrastructure in one of the tubes, in the state of assam on epc mode
Read moreEmergent repair work of nh 02 stretch from existing ch. km 253.300 karong bridge start point to km 258.100 senapati traffic point total length 4.800 km in the state of manipur in the year 2026-27
Read moreNhidcl/manipur/ 2025/mao-senapati/ strenthening/aafs/
Strengthening of mao to senapati section of old nh-39 (new nh-02) from existing chainage km 212.328 (mao gate) to km 264.313 (taphou kuki) in the state of manipur on epc mode (total length 51.985 km).
Read moreNhidcl/assam/2025 /baihatachariali to missionchariali /260456
Construction of 4 lane highway from baihata chariali (ch. 0.000), near guwahati to tezpur (ch. 150.971) excluding mangaldoi bypass (from ch. 28.500 to ch.42.590) along nh-15 in the state of assam on bot toll mode.
Read moreWidening and development of existing carriageway into 2lane with paved shoulder configuration along with construction of tunnels, viaducts and treatment of vulnerable sliding/sinking zones along nh10 from km 53.50 rangpo to km 79.371 ranipool
Read moreOnsultancy services for authority engineer ae for supervision of pango jorging, singa anleye, kamlang t junction deban and kharsang miao vijaynagar packages of frontier highway nh 913 in arunachal pradesh.
Read moreConstruction of uni-directional singhpora - vailoo twin tube tunnel (under sinthan pass) and its approach roads on kishtwar - vailoo - khanabal section of nh-244 in the union territory of jammu and kashmir on epc mode
Read moreof your Industry type