Tender Details
Particulars | Details |
---|---|
Title |
Reconstruction Of Major Bridge Across Gadhi River Near Dhodhani Village On Panvel Nere Maldunge Sh 103 Km. 16/800 Tal Panvel Dist Raigad
|
Description |
Reconstruction Of Major Bridge Across Gadhi River Near Dhodhani Village On Panvel Nere Maldunge Sh 103 Km. 16/800 Tal Panvel Dist Raigad
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1089732_2 |
Reference Number |
PD/AB/TC e-Ten Notice No. 53 for 2024-2025 Recall |
Tender Fee | 1680 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Panvel |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1901567 |
Start Date | September 21, 2024 23:45 |
End Date |
27/09/2024 ( Expired 255 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreConstruction of 36.00 meter span pre-stressed rcc bridge on pathri roh river near sukarasa village at pathri to bahadrabad road in haridwar graconstituency of haridwar district under state sector
Construction of 36.00 meter span pre-stressed rcc bridge on pathri roh river near sukarasa village at pathri to bahadrabad road in haridwar graconstituency of haridwar district under state sector
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Construction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Read moreConstruction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Read moreConstruction of foot over bridge at km. 331.600 of nh150a near b.g.kere village between the stretch of byrapura challakere section and foot over bridge at km. 341.960 near government polytechnic college, moraba on nh50 of hospet chitradurga section
Construction of foot over bridge at km. 331.600 of nh150a near b.g.kere village between the stretch of byrapura challakere section and foot over bridge at km. 341.960 near government polytechnic college, moraba on nh50 of hospet chitradurga section
Read moreConstruction of iconic hybrid cable stayed and suspension bridge across krishna river on nh 167k design chainage km 87.360 to km 88.437 in the states of telangana and andhra pradesh on epc basis
Construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh 167k design chainage km 87.360 to km 88.437 in the states of telangana and andhra pradesh on epc basis
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreConstruction of new 4 lane bridge over umardashi river with approachesat km. 153.300 design km. 153.080 of nh 58 near palanpur merwada village in the state of gujarat. job no. 058.gj.2024.25.776 upc_m.00058.25776.gj
Construction of new 4 lane bridge over umardashi river with approachesat km. 153.300 design km. 153.080 of nh 58 near palanpur merwada village in the state of gujarat. job no. 058.gj.2024.25.776 upc_m.00058.25776.gj
Read moreof your Industry type