Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Major Bridge Across Gadhi River On Road Connecting Kondichiwadi To Sh 103 Tal Panvel Dist Raigad
|
Description |
Construction Of Major Bridge Across Gadhi River On Road Connecting Kondichiwadi To Sh 103 Tal Panvel Dist Raigad
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1064225_1 |
Reference Number |
PD/AB/TC e-Ten Notice No. 21 for 2024-2025 |
Tender Fee | 3540 |
EMD | 2.64 Lakh |
Tender Value | |
Place | Panvel |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1857341 |
Start Date | August 03, 2024 20:30 |
End Date |
09/08/2024 ( Expired 281 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of major bridge over river umngot under nesids (roads)
Construction of major bridge including immediate approaches over river umngot on jongksha-kharang-dienglieng-nongjrong-moodymmai-wahiajer road, meghalaya under nesids (roads) (length - 110 m)
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of bypass road to rayagada town and jk pur town on nh-326 in the state of odisha.
Construction of bypass road to rayagada town and jk pur town on nh-326 in the state of odisha. 
 (bid ref no. 10 ce nh of 2024-25)
Read moreConstruction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Read moreof your Industry type