Tender Details

Particulars Details
Title
Slope Protection Work Over Drainage Cut No.03 Near Back Side Of Islampur Masjid For The Year 2023 24.
Description
Slope Protection Work Over Drainage Cut No.03 Near Back Side Of Islampur Masjid For The Year 2023 24.
Organisation Government of Odisha
Tender Id 2023_CEDC_95595_1
Reference
Number
EE-DD-CTC- 04/ 2023-24 / EE-DD-CTC-17/2023-24
Tender Fee 6000
EMD 15300
Tender Value
Place Executive Engineer, Drainage Division, Cuttack
Link https://tendersodisha.gov.in
Start Date October 13, 2023 16:30
End Date

25/10/2023 ( Expired 568 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Repair and renovation of underground drainage pipe line with brick chambers including m.s. grill near helpline building, adjacent to yodha marg, mathura cantt for the financial year 2025-26

Repair and renovation of underground drainage pipe line with brick chambers including m.s. grill&#x0d near helpline building, adjacent to yodha marg, mathura cantt for the financial year 2025-26

Read more
Repairing work of own house mla gunour vidhan sabha shri rajesh kumar verma for facility of video conferencing near taliya field at ward no 13 and mla panna shri brajendra pratap singh for facility of video conferencing near raj laxmi hotel ward 22

Repairing work of own house mla gunour vidhan sabha shri rajesh kumar verma for facility of video conferencing near taliya field at ward no 13 and mla panna shri brajendra pratap singh for facility of video conferencing near raj laxmi hotel ward 22

Read more
Mtc. of tarapur-sidhai road during the year 2025-26/sh protection work for erosion by pvc wire crates with allied works at local chera,south bijoynagar(length-55.00mtr)

Mtc. of tarapur-sidhai road during the year 2025-26/sh protection work for erosion by pvc wire crates with allied works at local chera,south bijoynagar(length-55.00mtr)

Read more
Ca no. ge af no.1/gur-13/2025-26 repair replacement and maintenance of unserviceable point wiring, flameproof lights fitting/fixtures, earthing infrastructure and allied work for lightening protection system at 54 asp at af stn gurgaon under ge (af)

Ca no. ge af no.1/gur-13/2025-26 repair replacement and maintenance of unserviceable point wiring, flameproof lights fitting/fixtures, earthing infrastructure and allied work for lightening protection system at 54 asp at af stn gurgaon under ge (af)

Read more
Slope protection work on right bank near siddhwarkut ghat of kaveri river to protect four pole structure of 33kv supply line

Slope protection work on right bank near siddhwarkut ghat of kaveri river to protect four pole structure of 33kv supply line

Read more
Repairing of dysfunctional boys toilet at pm shri battali high school, nakshatra bari jb school under khowai, padmabil block, khowai district for the year 2023-24

&amp#x0d repairing of dysfunctional boys toilet at pm shri battali high school, nakshatra bari jb school under khowai, padmabil block, khowai district for the year 2023-24&amp#x0d

Read more
Major repairing work at pm shri battali high school under khowai block, khowai district for the year 2023-24

Major repairing work at pm shri battali high school under khowai block, khowai district for the year 2023-24&amp#x0d &amp#x0d

Read more
Ca no ge(u)/chm-03/2025-26 spl repair to lt ug cable and connected items of work for md accn (sec-f) at chandimandir mil stn

Ca no ge(u)/chm-03/2025-26 spl repair to lt ug cable and connected items of work for md accn (sec-f) at chandimandir mil stn

Read more
Strengthening and raising existing damaged sea wall protection work at west side of hup tail dump yard near north side of light house area- phase-2

Strengthening and raising existing damaged sea wall protection work at west side of hup tail dump yard near north side of light house area- phase-2

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise