Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement, Testing, Installation, Commissioning, Operation And Maintenance Of 1.0 Lakh Smart Water Meters With Associated Communication And Billing System In Chennai City Under Hybrid Annuity Model (Ham).
|
| Description |
Procurement, Testing, Installation, Commissioning, Operation And Maintenance Of 1.0 Lakh Smart Water Meters With Associated Communication And Billing System In Chennai City Under Hybrid Annuity Model (Ham).
|
| Organisation | CMWSS Board | State Govt. and UT |
| Tender Id | 2025_CMWSS_544344_3 |
|
Reference Number |
CNT/WSS/NCB/TNIDB/002/2025-26 |
| Tender Fee | 0 |
| EMD | 2.5 Crore |
| Tender Value | - |
| Place | chennai |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=695605 |
| Start Date | July 17, 2025 20:30 |
| End Date |
Expired
21/08/2025
Expired 423 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Chambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreDevelopment of a 1 mld water treatment plant on the deval talao and campus dug well source and associated infrastructure at seepz sez mumbai on hybrid annuity model
Development of a 1 mld water treatment plant on the deval talao and campus dug well source and associated infrastructure at seepz sez mumbai on hybrid annuity model
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreProvn of smart digital meters with automatic electric metering system and billing software at bathinda military station (job no 81/sa/btd/amwp-02/2026-27)
Provn of smart digital meters with automatic electric metering system and billing software at bathinda military station (job no 81/sa/btd/amwp-02/2026-27)
Read moreConstruction of breakwater, rock bund, wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on hybrid annuity model (ham) under development of outer harbour at v.o. chidambaranar port.
Construction of breakwater, rock bund, wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on hybrid annuity model (ham) under development of outer harbour at v.o. chidambaranar port.
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read more4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
Read moreAppointment of consultant as independent engineer for the work of procurement, testing, installation, commissioning, operation and maintenance of 1.0 lakh smart water meters with associated communication and billing system in chennai city under
Appointment of consultant as independent engineer for the work of procurement, testing, installation, commissioning, operation and maintenance of 1.0 lakh smart water meters with associated communication and billing system in chennai city under
Read moreConstruction of vidyut bhawan annexe phase ii at janpath jaipur under hybrid annuity model ham including comprehensive operation and maintenance
Construction of vidyut bhawan annexe phase ii at janpath jaipur under hybrid annuity model ham including comprehensive operation and maintenance
Read moreof your Industry type