Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Raebareli Ring Road Phase Ii With Four Lane Configurations (Design Length 21.888 Km) For Rae Bareli City In The State Of Uttar Pradesh On Hybrid Annuity Model (Ham) Basis
|
| Description |
Construction Of Raebareli Ring Road Phase Ii With Four Lane Configurations (Design Length 21.888 Km) For Rae Bareli City In The State Of Uttar Pradesh On Hybrid Annuity Model (Ham) Basis
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2022_MoRTH_713022_1 |
|
Reference Number |
CE-RO/LKO/NH(O) /25/Rbly Ring Road Ph.-II/21-22 |
| Tender Fee | 80000 |
| EMD | 7.1 Crore |
| Tender Value | |
| Place | Chief Engineer - Regional Office,MoRTH Lucknow |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | September 17, 2022 14:30 |
| End Date |
Expired
16/08/2023
Expired 1071 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreIndependent engineer services for construction of raebareli ring road phase-ii with four lane configurations (design length 21.888 km) for rae-bareli city in the state of uttar pradesh on hybrid annuity model (ham) basis.
Independent engineer services for construction of raebareli ring road phase-ii with four lane configurations (design length 21.888 km) for rae-bareli city in the state of uttar pradesh on hybrid annuity model (ham) basis.
Read moreConstruction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.
Construction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.
Read moreIndependent engineer services for construction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.
Independent engineer services for construction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.
Read moreRfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Read moreRfp for widening/up-gradation to four lane configurations of shahjahanpur- bisalpur section from km 0.000 to km 47.026 of nh-731k on hybrid annuity mode in the state of uttar pradesh.
Rfp for widening/up-gradation to four lane configurations of shahjahanpur- bisalpur section from km 0.000 to km 47.026 of nh-731k on hybrid annuity mode in the state of uttar pradesh.
Read moreConstruction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Read moreRfp for construction of deoria bypass from existing km. 27.140 to existing km. 46.780 (design km. 49.109) on nh727a (design length 21.969 km.) to four lane with paved shoulder configuration under hybrid annuity mode (ham) in the state of up.
Rfp for construction of deoria bypass from existing km. 27.140 to existing km. 46.780 (design km. 49.109) on nh727a (design length 21.969 km.) to four lane with paved shoulder configuration under hybrid annuity mode (ham) in the state of up.
Read moreRehabilitation and upgradation of badwah-dhamnod road (sh-36) km 0.000 to km 62.555 from 2-lane to 4 lane with paved shoulder on hybrid annuity model (ham) in the state of madhya pradesh (total length 62.555 kms)
Rehabilitation and upgradation of badwah-dhamnod road (sh-36) km 0.000 to km 62.555 from 2-lane to 4 lane with paved shoulder on hybrid annuity model (ham) in the state of madhya pradesh (total length 62.555 kms)&#x0d
Read moreof your Industry type