Tender Details

Particulars Details
Title
Construction Of Raebareli Ring Road Phase Ii With Four Lane Configurations (Design Length 21.888 Km) For Rae Bareli City In The State Of Uttar Pradesh On Hybrid Annuity Model (Ham) Basis
Description
Construction Of Raebareli Ring Road Phase Ii With Four Lane Configurations (Design Length 21.888 Km) For Rae Bareli City In The State Of Uttar Pradesh On Hybrid Annuity Model (Ham) Basis
Organisation Central Public Procurement Portal 1
Tender Id 2022_MoRTH_713022_1
Reference
Number
CE-RO/LKO/NH(O) /25/Rbly Ring Road Ph.-II/21-22
Tender Fee 80000
EMD 7.1 Crore
Tender Value
Place Chief Engineer - Regional Office,MoRTH Lucknow
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date September 17, 2022 14:30
End Date
Expired 16/08/2023

Expired 1071 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Independent engineer services for construction of raebareli ring road phase-ii with four lane configurations (design length 21.888 km) for rae-bareli city in the state of uttar pradesh on hybrid annuity model (ham) basis.

Independent engineer services for construction of raebareli ring road phase-ii with four lane configurations (design length 21.888 km) for rae-bareli city in the state of uttar pradesh on hybrid annuity model (ham) basis.

Read more
Construction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.

Construction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.

Read more
Independent engineer services for construction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.

Independent engineer services for construction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.

Read more
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.

Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.

Read more
Rfp for widening/up-gradation to four lane configurations of shahjahanpur- bisalpur section from km 0.000 to km 47.026 of nh-731k on hybrid annuity mode in the state of uttar pradesh.

Rfp for widening/up-gradation to four lane configurations of shahjahanpur- bisalpur section from km 0.000 to km 47.026 of nh-731k on hybrid annuity mode in the state of uttar pradesh.

Read more
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode

Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode

Read more
Rfp for construction of deoria bypass from existing km. 27.140 to existing km. 46.780 (design km. 49.109) on nh727a (design length 21.969 km.) to four lane with paved shoulder configuration under hybrid annuity mode (ham) in the state of up.

Rfp for construction of deoria bypass from existing km. 27.140 to existing km. 46.780 (design km. 49.109) on nh727a (design length 21.969 km.) to four lane with paved shoulder configuration under hybrid annuity mode (ham) in the state of up.

Read more
Rehabilitation and upgradation of badwah-dhamnod road (sh-36) km 0.000 to km 62.555 from 2-lane to 4 lane with paved shoulder on hybrid annuity model (ham) in the state of madhya pradesh (total length 62.555 kms)

Rehabilitation and upgradation of badwah-dhamnod road (sh-36) km 0.000 to km 62.555 from 2-lane to 4 lane with paved shoulder on hybrid annuity model (ham) in the state of madhya pradesh (total length 62.555 kms)&amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise