Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hubballi Division: Collection Of Hydro Metrological Data During And After Monsoon For 2 Years (2024 25 And 2025 26) At
1) Br.No.44 Km 583 / 700 900 Of Span 10 X 6.10m 3 X 9.10m Between Gnj Knp And
2)br. No.184 Km 716 / 00 900 Of Span 14 X 45.72m Between Kud Ugr In Ld Mrj Section.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75696623 |
|
Reference Number |
13UBL24-25DT130624ITEM-05 |
| Tender Fee | 0 |
| EMD | 91400 |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75696623/viewNitPdf_4607096.pdf |
| Start Date | June 14, 2024 19:00 |
| End Date |
Expired
10/07/2024
Expired 826 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of existing rcc slabs of 6.10 m span to psc slab of 6.10m span of existing bridge no-485,505,509,511,518,519,520,453,474,478/a and 478/b in between nbq-rny-agt section.
For complete deion and other details, please refer to tender
Read moreReplacement of existing rcc slabs of 6.10 m span to psc slab of 6.10m span of existing bridge no-485,505,509,511,518,519,520,453,474,478/a and 478/b in between nbq-rny-agt section.
For complete deion and other details, please refer to tender
Read moreRepairs to br.no.69 span 12x30.50m psc (box girders) at km 33/900 - 34/ 400 in between dru-cmgr section.
For complete deion and other details, please refer to tender
Read moreRepairs to br.no.69 span 12x30.50m psc (box girders) at km 33/900 - 34/ 400 in between dru-cmgr section.
For complete deion and other details, please refer to tender
Read moreHubballi division: strengthening of super structure by re-girdering of br no. 142/a (span 1x13.18m pg rub) at km 680/500-600 between gpb-ckr stations in ld-mrj section of ubl division.
For complete deion and other details, please refer to tender
Read moreTumkuru-arsikere section: proposed construction of rob in lieu of lc no. 88 at km:149/900-150/000 with 1x30m bow-string girder and 2x18.71m psc girder re blocks (approach span) between tiptur and honnavalli road stations.
For complete deion and other details, please refer to tender
Read moreLonda-miraj section-construction of rob at km.613/800-900 in lieu of lc no 392 between belagavi-sambre station as 1x36m composite girder clear span ( railway portion) with 5x18.71m psc girder (nh end) and 6x18.71 m psc girder (mutaga end) and cc block in approaches between belagavi and sambre stations.(composite work)
For complete deion and other details, please refer to tender
Read moreKollam - thiruvananthapuram section - construction of proposed road over bridge in lieu of lc no. 545 at rly km 157/900-158/000 between kollam and mayyanad stations of thiruvananthapuram division (7.50m two lane carriageway, 1x36m eff. composite girder for railway span and 8x25m psc girder for approaches)
For complete deion and other details, please refer to tender
Read moreKollam - thiruvananthapuram section - construction of proposed road over bridge in lieu of lc no. 545 at rly km 157/900-158/000 between kollam and mayyanad stations of thiruvananthapuram division (7.50m two lane carriageway, 1x36m eff. composite girder for railway span and 8x12m psc girder for approaches) with 100 percent funding by railways
For complete deion and other details, please refer to tender
Read moreSw i: replacement of steel girder with psc slab for bridge no. 490 (1x12.20m) at km 29/800-900 between rajanukunte and dodballapur stations of baiyappanahalli - dharmavaram section. sw-ii: replacement of steel girder with psc slabs of size above 9.15m and up to 12.20m span bridges for bridge no. 448 at km 8/398 between nayandahalli (nyh) - jnana bharati halt (gnb) stations of bengaluru - mysuru section. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type