Tender Details
Particulars | Details |
---|---|
Title |
Tumkuru Arsikere Section: Proposed Construction Of Rob In Lieu Of Lc No. 88 At Km:149/900 150/000 With 1x30m Bow String Girder And 2x18.71m Psc Girder Re Blocks (Approach Span) Between Tiptur And Honnavalli Road Stations.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79444532 |
Reference Number |
SWR-RSP-ROB-LC88 |
Tender Fee | 0 |
EMD | 12.5 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79444532/viewNitPdf_4828246.pdf |
Start Date | January 11, 2025 01:53 |
End Date |
12/02/2025 ( Expired 67 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of complete rob & limited height subway in lieu of lc 4 (railway portion except steel girder approach road in state portion) at km 60/23-25 in indara yard, lc 67c (railway portion including steel girder approach road in state portion) at km 95/273 between kkt-pou section & lc 115 (only railway portion including bow string girder) at km 433/723 in btt yard of varanasi division in n. e. railway
For complete deion and other details, please refer to tender
Read moreConstruction of 4 lane rob including railway portion with n type steel girder and composite girder on pile foundation. psc girder on pile foundation and reinforced earth (re) wall in approaches in lieu of lc no. 25-b at rly. km 591/6-7 between jatpipli -bajana stations on viramgam - samakhiyali section of ahmedabad division of western railway under gati shakti unit, ahmedabad.
For complete deion and other details, please refer to tender
Read moreTumkuru-arsikere section: proposed construction of rob in lieu of lc no. 88 at km:149/900-150/000 with 1x30m bow-string girder and 2x18.71m psc girder re blocks (approach span) between tiptur and honnavalli road stations.
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge with subway in lieu of level crossing no.86 as 1x30m composite girder with 8x18m psc girder towards hassan side and 8x18m psc girder towards nh side at railway km.142/700-800 between tiptur and honnavalli road stations in tumakuru- arsikere section.(composite work).
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.38 at km 65/300-400 with 1x42m bowstring girder ( railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 5x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations including electrical works (composite work).
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no .39 at km 66/200-300 with 1x42m bowstring girder (railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 17x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations and proposed construction of lhs in lieu of lc 39 at km 66/200-300 as 1x5.5x2.5m rcc box including electrical works (composite work)
For complete deion and other details, please refer to tender
Read moreSw-i:guduru - vijayawada section: additions and alterations to ohe in connection with proposed construction of road over bridge of span 1 x 54.00 m bow string arch girder in lieu of lc no.122 at km. 178/28-30 in padugupadu yard . sw-ii-name of the work: vijayawada division - els/bza: additions and alterations to ohe in connection with provisino of infrastructure for wheel repair facilities at electric loco shed, vijayawada .
For complete deion and other details, please refer to tender
Read moreLonda-miraj section-construction of rob at km.613/800-900 in lieu of lc no 392 between belagavi-sambre station as 1x36m composite girder clear span ( railway portion) with 5x18.71m psc girder (nh end) and 6x18.71 m psc girder (mutaga end) and cc block in approaches between belagavi and sambre stations.(composite work)
For complete deion and other details, please refer to tender
Read moreConstruction of railway portion of two lane road over bridge (1 x 60.00m bow string arch steel girder) at km. 63/09 - 10 in lieu of level crossing no. 45 in indore - dewas section, between barlai - mangliyagaon stations of ratlam division western railway
For complete deion and other details, please refer to tender
Read moreof your Industry type