Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 2 Lane Rob In Lieu Of Lc No.46 (Manned) At Km:78/340 With 1x42m Bow String Girder In Mallasandra Yard And Construction Of Limited Height Subway Of Size 5.5x2.5m Between Tumkuru Mallasandra Stations (Composite Work)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78215849 |
Reference Number |
ASK-TK-ROB-LC-46 |
Tender Fee | 0 |
EMD | 11.8 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78215849/viewNitPdf_4760116.pdf |
Start Date | November 27, 2024 16:13 |
End Date |
20/12/2024 ( Expired 143 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreConsultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of remaining work rob in lieu lc no. 265 (railway km. 301.024) on sikar-jhunjhunu-luharu road (excluding cost of cement).
Construction of remaining work rob in lieu lc no. 265 (railway km. 301.024) on sikar-jhunjhunu-luharu road (excluding cost of cement).
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreWidening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Read moreConstruction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur
Construction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur
Read moreConst. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Read moreof your Industry type