Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hubballi Division: Strengthening Of Super Structure By Re Girdering Of Br No. 142/A (Span 1x13.18m Pg Rub) At Km 680/500 600 Between Gpb Ckr Stations In Ld Mrj Section Of Ubl Division.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78468341 |
|
Reference Number |
04BR-UBL-24-25-ITEM-01 |
| Tender Fee | 0 |
| EMD | 34200 |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78468341/viewNitPdf_4773803.pdf |
| Start Date | November 19, 2024 23:49 |
| End Date |
Expired
12/12/2024
Expired 669 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carrying out of following s&t works & associated engineering and electrical works sub work 1:swr : ubl division : throughput enhancement and safety work by replacement of track detection system without glued joints in ranjithpura stations of hubballi division sub work 2: a) provision of intermediate block signaling (ibs) between rbg-ckr section in ld-mrj section over hubballi division b) provision of intermediate block signaling (ibs) between gpb-ckr section in ld-mrj section over h
For complete deion and other details, please refer to tender
Read moreHubballi division: hubballi-londa (ubl-ld) section: construction of pedestrian subway [5.0 x 3.2m] at km 486/600 in between navalur-dharwad (nvu-dwr) station. (maintenance period=04 months)
For complete deion and other details, please refer to tender
Read moreHubballi division:- sw-i: alnawar-londa-miraj- (lwr-ld-mrj) section- provision of standard height gauge for lhs no.45a, 119a1, 122, 164/c1 belagavi-miraj ( bgm-mrj) under aden/bgm sub division. sw-ii: alnawar-londa-miraj- (lwr-ld-mrj) section- provision of standard height gauge for lhs no.131/a alnawar-londa (lwr-ld), 32/a, 65, 68a londa-belagavi(ld-bgm) under aden/bgm sub division. (maintenance period= 02 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: ld-vsg section: proposed construction rub of size 5m x 4.00m at km 107/700-800 in vasco da gama yard.
For complete deion and other details, please refer to tender
Read moreHubballi division:_ hubballi-londa(ubl-ld) section-construction of limited height subway in lieu of lc.no.315 at km.516/9 to 517/000 in between kambrganvi-kashanatti (kbi-khst) stations by box pushing method. (maintenance period=06 months)
For complete deion and other details, please refer to tender
Read moreHubballi division-sw-i-south hubballi-alnawar (subl-lwr) section: swp to lwr on loop lines for 8.74 km in aden/west jurisdiction sw-ii: londa-miraj (ld-mrj) section: swp to lwr on loop lines for 5.93 km in aden/bgm jurisdiction.
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-i)ld-mrj section-ctr (p) at gnj yard rd-2 dn main line for a length of 0.968km. sw-ii) ld-vsg section ctr(s) in qlm yard for a length of 0.758km in ld-vsg section. sw-iii) increasing of sleeper density on loop lines for a length of 1.689km in ld-vsg section.
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-1 fabrication and supplying of temporary girder two number of 26.80m length for rob/rub works under the jurisdiction of sse/br/ubl. sw-2 fabrication and supply of christ chruch (cc) cribs (1000 nos) for use under the jurisdiction of sse/bridges/o/ubl.
For complete deion and other details, please refer to tender
Read moreHubballi division: collection of hydro metrological data during and after monsoon for 2 years (2024-25 and 2025-26) at 1) br.no.44 km 583 / 700-900 of span 10 x 6.10m 3 x 9.10m between gnj-knp and 2)br. no.184 km 716 / 00-900 of span 14 x 45.72m between kud-ugr in ld - mrj section.
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-1 - providing side pathway for bridge nos.157dn span 1x12.20m, br.no.31/a up, dn & loop line span 3x12.20, br.no139/a dn span 1x30.50m in gdg-bay section, bridge no 46>47e span 1x9.15m in bgk-bjp section, bridge no.133 span 1x30.50m in hpt-vc-kty section and bridge no.253 span 1x45.70m in ubl-dwr section under sse/bridge/ubl jurisdiction. sw-2 rub no.228a up span (1x19.15 pg) & 228a dn (span 1x10.35m psc), br no 16 span 1x12.20m1x18.30m pg, br no 109 u
For complete deion and other details, please refer to tender
Read moreof your Industry type