Tender Details
Particulars | Details |
---|---|
Title |
Hubballi Division: Hubballi Londa (Ubl Ld) Section: Construction Of Pedestrian Subway [5.0 X 3.2m] At Km 486/600 In Between Navalur Dharwad (Nvu Dwr) Station. (Maintenance Period=04 Months)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79693990 |
Reference Number |
39UBL24-25DT270125ITEM-02 |
Tender Fee | 0 |
EMD | 2.51 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79693990/viewNitPdf_4841775.pdf |
Start Date | January 29, 2025 23:47 |
End Date |
25/02/2025 ( Expired 102 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Construction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreConstruction of 2-lane rob on rhs at railway km.568/17-19 near kondapalli station on kazipet-vijayawada section of vijayawada division at km.5.467 of ibrahimpatnam-chandragudem section of nh-30 in the state of ap
Construction of 2-lane rob on rhs at railway km.568/17-19 near kondapalli station on kazipet-vijayawada section of vijayawada division at km.5.467 of ibrahimpatnam-chandragudem section of nh-30 in the state ofap
Read moreHubballi division: hubballi-londa (ubl-ld) section: construction of pedestrian subway [5.0 x 3.2m] at km 486/600 in between navalur-dharwad (nvu-dwr) station. (maintenance period=04 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: strengthening of super structure by re-girdering of br no. 142/a (span 1x13.18m pg rub) at km 680/500-600 between gpb-ckr stations in ld-mrj section of ubl division.
For complete deion and other details, please refer to tender
Read moreHubballi division:_ hubballi-londa(ubl-ld) section-construction of limited height subway in lieu of lc.no.315 at km.516/9 to 517/000 in between kambrganvi-kashanatti (kbi-khst) stations by box pushing method. (maintenance period=06 months)
For complete deion and other details, please refer to tender
Read moreConstruction of limited height sub way near at lc 50 at ir km 65 5 6 between sangariya dhaban railway station hanumangarh bhatinda section span 1 x 5 5 x 3 60m precast rcc box
Construction of limited height sub way near at lc 50 at ir km 65 5 6 between sangariya dhaban railway station hanumangarh bhatinda section span 1 x 5 5 x 3 60m precast rcc box
Read moreBalance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Balance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Read moreof your Industry type