Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hubballi Division: South Hubballi Dharwad (Subl Dwr) Section: Construction Of Precast Rcc Boundry Wall For A Length Of 2.3km. (Maintenance Period = 03 Months)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79486678 |
|
Reference Number |
39UBL24-25DT270125ITEM-01 |
| Tender Fee | 0 |
| EMD | 2.74 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79486678/viewNitPdf_4831068.pdf |
| Start Date | January 30, 2025 00:18 |
| End Date |
Expired
25/02/2025
Expired 596 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hubballi division: south hubballi- karajagi (subl-kjg ) section: construction of precast rcc boundary wall for a length of 12.8 km.(maintenance period 2 years )two packet system.
For complete deion and other details, please refer to tender
Read moreHubballi division: hubballi-londa (ubl-ld) section: construction of pedestrian subway [5.0 x 3.2m] at km 486/600 in between navalur-dharwad (nvu-dwr) station. (maintenance period=04 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: proposed setting up of carriage watering arrangements gdg and dwr station of ubl division.(maintenance period=06 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: ctr(p)-2.20km (in patches) in hubballi-alna(ubl-lwr) section. sw-i: ctr(p)-0.60km (in patches) in dharwad-kyarkop (dwr-krkp) section. sw-ii: ctr(p)-length of 0.60 km in mugad-kambrganvi(mgd-kbi) section. sw-iii: ctr(p)-length of 1.00km in mugad-kambrganvi (mgd-kbi) section.
For complete deion and other details, please refer to tender
Read moreHubballi division: dharwad: installation of biogas plant to reuse the kitchen waste and to produce cooking gas.(maintenance period: 06 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: maintenance of track in aden/central/ubl jurisdiction in hubballi gadag (ubl-gdg) up & dn lines, gadag- badami (gdg-bdm) up & dn lines including gdg bypass,karajgi-south hubballi (kjg-subl) up & dn lines for a period of one year.
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-i: con of existing cc apron on rd-3 & rd-4 of hubli yard to ballsted track. sw-ii:hubli-dharwad section: deep screening of yard linesin navalur-and dharwad yards for a length of 5.76km. (maintenance period=03 months)
For complete deion and other details, please refer to tender
Read moreHubballi division-sw-i-south hubballi-alnawar (subl-lwr) section: swp to lwr on loop lines for 8.74 km in aden/west jurisdiction sw-ii: londa-miraj (ld-mrj) section: swp to lwr on loop lines for 5.93 km in aden/bgm jurisdiction.
For complete deion and other details, please refer to tender
Read moreHubballi division: tftr on br.no.91 approaches for a length of 0.9km in gadag-hotgi (gdg-hg) section.(maintenance period= 03 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-i: repairs to hydrant post of pf no.5 hydrant line at hubballi railway station. sw-ii: hubballi division: repairs to boundary wall between 489/810 to 490/040 for length 275m length near railway track at dharwad.sw-iii: hubballi: repairs to sse/pway/east/ubl, sse/pway/west/ubl, sse/w/m/ubl, sse/qtrs/ubl, sse/w/ww/ubl, sse/w/bri/ubl stores and artizen shed at hubballi. (maintenance period=03 months)
For complete deion and other details, please refer to tender
Read moreof your Industry type