Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hubballi Division: Ctr(p) 2.20km (In Patches) In Hubballi Alna(ubl Lwr) Section. Sw I: Ctr(p) 0.60km (In Patches) In Dharwad Kyarkop (Dwr Krkp) Section. Sw Ii: Ctr(p) Length Of 0.60 Km In Mugad Kambrganvi(mgd Kbi) Section. Sw Iii: Ctr(p) Length Of 1.00km In Mugad Kambrganvi (Mgd Kbi) Section.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73291731 |
|
Reference Number |
51UBL23-24DT310124ITEM-02 |
| Tender Fee | 0 |
| EMD | 97700 |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73291731/viewNitPdf_4465082.pdf |
| Start Date | February 05, 2024 18:34 |
| End Date |
Expired
29/02/2024
Expired 959 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hubballi division: proposed construction of lobour room, merchant room, and cgsr room with fois connectivity, drinking water and toilet / bathroom facilities and approach road to goods loading & unloading area at kyarkop (krkp).(maintenance period-3 years)
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-i: hubballi- karajgi- ctr(p)-27.800tkm. sw-ii: isd over loop line in ubl-kjg for a length of 3.6km. sw-ii: isd (increasing sleeper density) over loop line in hubballi-karajgi(ubl-kjg) for a length of 3.6 km.
For complete deion and other details, please refer to tender
Read moreHubballi division:_ hubballi-londa(ubl-ld) section-construction of limited height subway in lieu of lc.no.315 at km.516/9 to 517/000 in between kambrganvi-kashanatti (kbi-khst) stations by box pushing method. (maintenance period=06 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-i)ld-mrj section-ctr (p) at gnj yard rd-2 dn main line for a length of 0.968km. sw-ii) ld-vsg section ctr(s) in qlm yard for a length of 0.758km in ld-vsg section. sw-iii) increasing of sleeper density on loop lines for a length of 1.689km in ld-vsg section.
For complete deion and other details, please refer to tender
Read moreHubballi division: (sw-i) protection of track by provision of catchwater drains, side drains at clr-qlm section. (sw-ii)ld-vsg section:- construction of rcc side drain for a length of 6.10km in patches (from 3.00km to 50.00km) (maintenance period: 03 months)
For complete deion and other details, please refer to tender
Read moreof your Industry type