Tender Details
Particulars | Details |
---|---|
Title |
Hubballi Division: (Sw I) Protection Of Track By Provision Of Catchwater Drains, Side Drains At Clr Qlm Section.
(Sw Ii)ld Vsg Section: Construction Of Rcc Side Drain For A Length Of 6.10 Km In Patches (From 3.00 Km To 50.00 Km) (Maintenance Period: 03 Months)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72747877 |
Reference Number |
46UBL23-24DT261223ITEM-02 |
Tender Fee | 0 |
EMD | 6.17 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72747877/viewNitPdf_4435729.pdf |
Start Date | December 27, 2023 01:49 |
End Date |
22/01/2024 ( Expired 477 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hubballi division: sw-i:- proposed construction of high level platform at parankanahatti halt station(proposed length 560 m x width 6.0mtrs) sw-ii: proposed construction of track machine rest house in khanapur, desur, sulebhavi and pachchapur. sw-iii: provision of low cost platform shelters at parakanahatti.
For complete deion and other details, please refer to tender
Read moreHubballi division:- sw-i:- bagewadi station-raising and extension of platform no.01 to make high level of 560m length with cement concrete flooring at bagewadi station. (maintenance period= 06 months ) .sw-ii:-proposed construction of track machine rest house in chikkodi road, chinchili, sedbal and vijaynagar. (maintenance period= 03 years) sw-iii-provision of low cost platform shelters at bagewadi station. (maintenance period= 06months )
For complete deion and other details, please refer to tender
Read moreHubballi division: protection of track from landslide/boulder falling in tunnel approaches (16 nos of tunnels) by extension of tunnel portals and construction of retaining walls in castlerock- kulem (clr-qlm) ghat section. (maintenance period= 12 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: londa-vasco (ld-vsg): rebuilding of br. no.75 and associated protection works such as flooring, pitching, tunnel portal extension, slope stabilization, retaining wall, side drain, etc. at the landslide spot (km 28/800-29/000) between tunnel no.2 & 3 in castlerock-canranzol (clr-crz) section.(two packet system)
For complete deion and other details, please refer to tender
Read moreHubballi division-sw-i-protection of track from falling of boulders from vertical cuttings by provision of boulder netting in londa-vasco (ld-vsg) section at in between km 29/300 to 40/100. sw-ii-stabilization of vulnerable cutting slopes by provision of wire mesh with turf reinforcement mat along with self drilling anchor and rock fall barriers in castlerock-kulem(clr-qlm) section. (special conditions to be follow)
For complete deion and other details, please refer to tender
Read moreHubballi division-sw-i- provision of drain covers for side drains along the track in aden/west sub division, sw-ii-extension of compound wall near pf-06 towards south-ubl at 3rd entry. sw-iii-repairs to quarters by providing tiles at new vinoba nagar colony under the jurisdiction of aden/hq/ubl. sw-iv-repair works to mddti dharwad. (maintenance period=03months)
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-i: castlerock:- improvement works to sewage pipeline, strom water drain and approach road to genetine chawl and gangchawl. sw-i(a): improvement to sewage line and strom water drain in gang chal at castle rock. sw-i(b): improvement to road along with drain at genetin chawl and market road at castle roack. sw-ii: sambre (way-side) provision of additional facilities at sambre(sxb) goods shed (provision of labour rooms with drinking water facility at sambre. (03 years for new
For complete deion and other details, please refer to tender
Read moreEls/bza- additional proposal for els/bza- provision of infrastructure facilities for maintaining of three phase locomotives (wap7 & wag9). (id no.11.06.42.23.3.55.004 of umbrella 2023-24) civil portion : sw-1: construction of compound wall for 100.0 m length in place of existing damaged compound wall duly providing fencing to the existing compound wall along the side of newly constructed inspection bay for 1200m in sse/works/bza section. sw-ii : provision of loco body washing &
For complete deion and other details, please refer to tender
Read moreRegular maintenance of cleaning of roads, road side margins, drains open spaces and cleaning away garbage / debris in autonagar guntur (ph-i, ii, ii iv, ida) guntur district for the year 2024-25 for a period of 4.50 months (november 15-11-2024 to march 31-03-2024) with iala funds
Regular maintenance of cleaning of roads, road side margins, drains open spaces and cleaning away garbage / debris in autonagar guntur (ph-i, ii, ii iv, ida) guntur district for the year 2024-25 for a period of 4.50 months (november 15-11-2024 to march 31-03-2024) with iala funds
Read moreKsr bengaluru: sw-i: proposed civil works for the provision of lift - 1no. at pf no. 9 and 10 for fob at bnc end of ksr bengaluru station. sw-ii: proposed civil works for the provision of lift - 1no. at pf no. 5 and 6 for fob at bnc end of ksr bengaluru station. sw-iii: provision of lift to fob connecting metro sky walk on back side of ksr bengaluru station. sw-iv: ksr bengaluru - mysore section: proposed constructions of track men rest room/tool room. - 7nos. in aden/mya section - balance
For complete deion and other details, please refer to tender
Read moreof your Industry type