Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hubballi Division: Hubballi Londa(ubl Ld) Section Construction Of Limited Height Subway In Lieu Of Lc.No.315 At Km.516/9 To 517/000 In Between Kambrganvi Kashanatti (Kbi Khst) Stations By Box Pushing Method. (Maintenance Period=06 Months)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77143772 |
|
Reference Number |
27UBL24-25DT180924ITEM-04 |
| Tender Fee | 0 |
| EMD | 4.23 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77143772/viewNitPdf_4698360.pdf |
| Start Date | September 25, 2024 22:26 |
| End Date |
Expired
18/10/2024
Expired 727 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hubballi division: supply of ballast at londa depot in den/west/ubl jurisdiction.
For complete deion and other details, please refer to tender
Read moreHubballi division: supply of ballast at londa depot in sr.den/west/ubl jurisdiction.
For complete deion and other details, please refer to tender
Read moreHubballi division: hubballi-londa (ubl-ld) section: construction of pedestrian subway [5.0 x 3.2m] at km 486/600 in between navalur-dharwad (nvu-dwr) station. (maintenance period=04 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: londa-belagavi (ld-bgm) section: rebuilding of br. no 91 & 112 [up line] on ac of orn 3 with precast rcc segmental boxes/ box pushing method in desur-belagavi (dur-bgm) section.
For complete deion and other details, please refer to tender
Read moreHubballi division:- sw-i: alnawar-londa-miraj- (lwr-ld-mrj) section- provision of standard height gauge for lhs no.45a, 119a1, 122, 164/c1 belagavi-miraj ( bgm-mrj) under aden/bgm sub division. sw-ii: alnawar-londa-miraj- (lwr-ld-mrj) section- provision of standard height gauge for lhs no.131/a alnawar-londa (lwr-ld), 32/a, 65, 68a londa-belagavi(ld-bgm) under aden/bgm sub division. (maintenance period= 02 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: aden/castlerock sub division: improvements to existing minor bridges in londa - vasco-da-gama( ld-vsg) section. (maintenance period=03 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: ctr(p)-2.20km (in patches) in hubballi-alna(ubl-lwr) section. sw-i: ctr(p)-0.60km (in patches) in dharwad-kyarkop (dwr-krkp) section. sw-ii: ctr(p)-length of 0.60 km in mugad-kambrganvi(mgd-kbi) section. sw-iii: ctr(p)-length of 1.00km in mugad-kambrganvi (mgd-kbi) section.
For complete deion and other details, please refer to tender
Read moreHubballi division: londa-belagavi (ld-bgm) section: rebuilding of br. no 91 & 112 [up line] on ac of orn 3 with precast rcc segmental boxes/ box pushing method in desur-belagavi (dur-bgm) section.(maintenance period:12months)
For complete deion and other details, please refer to tender
Read moreHubballi division-sw-i-south hubballi-alnawar (subl-lwr) section: swp to lwr on loop lines for 8.74 km in aden/west jurisdiction sw-ii: londa-miraj (ld-mrj) section: swp to lwr on loop lines for 5.93 km in aden/bgm jurisdiction.
For complete deion and other details, please refer to tender
Read moreHubballi division: strengthening of super structure by re-girdering of br no. 142/a (span 1x13.18m pg rub) at km 680/500-600 between gpb-ckr stations in ld-mrj section of ubl division.
For complete deion and other details, please refer to tender
Read moreof your Industry type