Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fdr / Mtc. Of Construction Of Rcc Boxcell (4.00m X 4.00m) At Ch 2.50 Km Over Local Cherra On The Road From Madhabnagar To Manughat Road (State Highway) (L 26.501 Km) Under Poangbari Block /
|
| Description |
Sh Const. Of Boxcell (4m X 4m), Wing Wall, Retaining Wall Etc. During The Year 2024 25. (Portion From 0.00 Km To 15.10 Km)
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_53340_1 |
|
Reference Number |
21(3)/PNIeT/EE/PWD/SBM/24-25 |
| Tender Fee | 1000 |
| EMD | 93903 |
| Tender Value | |
| Place | SATCHAND |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=54220 |
| Start Date | September 26, 2024 23:30 |
| End Date |
Expired
03/10/2024
Expired 634 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Read moreFdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 1.20 km over local cherra on the road from madhubari to goursingbari via haridhan para (l-3.050 km) under poangbari block/
Sh- const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Read moreFdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 0.350 km over local cherra on the road from kalachara to manirambari road via gardhang (l-9.50 km) under satchand block /
Sh - const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Read moreFdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 0.010 km over local cherra on the road from sonamohan para to kalibazar (l-4.20 km) under satchand block /sh- const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Fdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 0.010 km over local cherra on the road from sonamohan para to kalibazar (l-4.20 km) under satchand block /sh- const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Read moreFdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 1.15 km over local cherra on the road fromnh-8 to mani charan para under shakbari adc village (l-1.775 km) under satchand block /
Sh - const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Read moreFdr/mtc. of construction of rcc boxcell (2.00m x 2.00m) at ch 1.80 km over local cherra on the road from t03 (us road to manughat para) to manchanda (rout no-t01) (l-5.384 km) under satchand block
Sh - const. of boxcell (2m x 2m), wing wall etc. during the year 2024-25
Read moreFdr/ maintenance of road from kirit saha para to fukuljoy para (l052, p-2) (l-3.994 km) at ch.3.874 km during the year 2024-25/sh-construction of 1(one) no. rcc boxcell (4.00m x 4.00m single cell) at ch.3.874 km over local cherra. (gr-i)
Fdr/ maintenance of road from kirit saha para to fukuljoy para (l052, p-2) (l-3.994 km) at ch.3.874 km during the year 2024-25/sh-construction of 1(one) no. rcc boxcell (4.00m x 4.00m single cell) at ch.3.874 km over local cherra. (gr-i)
Read moreMtc. of road from poangbari to madhabnagar road (l-5.70 km)/sh- construction of rcc boxcell (2.00m x 2.00m) at ch 2.80 km over local cherra and cc block placement at local cherra on the road from madhubari to goursing bari (l-3.050 km)
Under poangbari block during the year 2024-25.
Read moreMtc of road from poangbari to madhabnagar road (l-5.70 km)
Sh- construction of rcc boxcell (2.00m x 2.00m) at ch 4.10 km, patch metalling, patch carpeting and seal coat under poangbari block during the year 2025-26.
Read moreMtc. of road from poangbari to madhabnagar road (l-5.70 km) / sh- construction of rcc boxcell (2.00m x 2.00m) at ch 3.20 km over local cherra on the road from and cc block placement at local cherra on the road from srinagar bazar to srinagar bop
(l-0.800 km) under poangbari block during the year 2024-25
Read moreof your Industry type