Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtc. Of Road From Poangbari To Madhabnagar Road (L 5.70 Km)/Sh Construction Of Rcc Boxcell (2.00m X 2.00m) At Ch 2.80 Km Over Local Cherra And Cc Block Placement At Local Cherra On The Road From Madhubari To Goursing Bari (L 3.050 Km)
|
| Description |
Under Poangbari Block During The Year 2024 25.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_58609_1 |
|
Reference Number |
33(13)/PNIeT/24-25. 136/DNIeT/EE/PWD/SBM/DIVN |
| Tender Fee | 1000 |
| EMD | 48512 |
| Tender Value | |
| Place | Poangbari |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=59701 |
| Start Date | February 22, 2025 00:25 |
| End Date |
Expired
13/03/2025
Expired 467 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtc of road from poangbari to madhabnagar road (l-5.70 km)
Sh- construction of rcc boxcell (2.00m x 2.00m) at ch 4.10 km, patch metalling, patch carpeting and seal coat under poangbari block during the year 2025-26.
Read moreFdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 1.20 km over local cherra on the road from madhubari to goursingbari via haridhan para (l-3.050 km) under poangbari block/
Sh- const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Read moreFdr/mtc. of road from madhubari to goursing bari via haridhan para (l- 3.050 km)/ sh - gsb, wbm-iii, paver block etc. during the year 2024-25. (portion from ch. 2.875 km to ch. 3.050 km). gr-ii.
Fdr/mtc. of road from madhubari to goursing bari via haridhan para (l- 3.050 km)/ sh - gsb, wbm-iii, paver block etc. during the year 2024-25. (portion from ch. 2.875 km to ch. 3.050 km). gr-ii.
Read moreFdr/mtc. of road from madhubari to goursing bari via haridhan para (l- 3.050 km)
Sh- construction of boxcell (1m x1m), gsb, wbm-iii, paver block etc. during the year 2024-25. (portion from ch. 2.70 km to ch. 2.875 km). gr-i
Read moreFdr / mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 2.50 km over local cherra on the road from madhabnagar to manughat road (state highway) (l-26.501 km) under poangbari block /
Sh - const. of boxcell (4m x 4m), wing wall, retaining wall etc. during the year 2024-25. (portion from 0.00 km to 15.10 km)
Read moreFdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 0.350 km over local cherra on the road from kalachara to manirambari road via gardhang (l-9.50 km) under satchand block /
Sh - const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Read moreFdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 1.15 km over local cherra on the road fromnh-8 to mani charan para under shakbari adc village (l-1.775 km) under satchand block /
Sh - const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Read moreFdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 0.010 km over local cherra on the road from sonamohan para to kalibazar (l-4.20 km) under satchand block /sh- const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Fdr/mtc. of construction of rcc boxcell (4.00m x 4.00m) at ch 0.010 km over local cherra on the road from sonamohan para to kalibazar (l-4.20 km) under satchand block /sh- const. of boxcell (4m x 4m), wing wall etc. during the year 2024-25
Read moreFdr/mtc. of construction of rcc boxcell (2.00m x 2.00m) at ch 1.80 km over local cherra on the road from t03 (us road to manughat para) to manchanda (rout no-t01) (l-5.384 km) under satchand block
Sh - const. of boxcell (2m x 2m), wing wall etc. during the year 2024-25
Read moreFdr/ maintenance of road from satchand -bankul road to sevadhan para (l-1.50 km) during the year 2025-26 / sh -construction of 1(one) no. rcc boxcell (5.00m x 5.00m, tripple cell) at ch.3.874 km over local cherra and approach road etc.
Fdr/ maintenance of road from satchand -bankul road to sevadhan para (l-1.50 km) during the year 2025-26 / sh -construction of 1(one) no. rcc boxcell (5.00m x 5.00m, tripple cell) at ch.3.874 km over local cherra and approach road etc.
Read moreof your Industry type