Tender Details

About Tender

🛣️ Invitation For Bids: Authority Engineer For Nh 354 & Nh 754 Bypass Construction 🛠️ The Ministry Of Road Transport And Highways, Under The Central Government, Invites Bids From Experienced Consultants For The Role Of Authority Engineer To Supervise The Construction Of A New 4 Lane Highway With Paved Shoulders On The Sri Muktsar Sahib Bypass In Punjab. 📅 Bid Submission Deadline: July 25, 2024, 3:00 Pm Tender Fee: Inr 5000 Emd: Nil Interested Consultants Should Possess The Necessary Qualifications And Experience In Highway Construction Projects. Bids Must Include Detailed Project Supervision Plans, Qualifications Of The Team, And A Comprehensive Cost Estimate. Keywords: Consultancy Services, Authority Engineer, Highway Construction, Nh 354 & Nh 754 Bypass, Punjab, Infrastructure Project, Government Tender, Bid Submission
Particulars Details
Title
Consultancy services for authority engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab
Description
Consultancy services for authority engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5000
EMD 0
Tender Value
Place PUNJAB
Link

AAAAAAAAAA

Login to view
End Date

25/07/2024 ( 5 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Access controlled highway of 4 lane with paved shoulders from walajapet/ ranipet (design chainage km 106.800) to tn/ ap border (design km 134.879) of nh40 in tamil nadu on hybrid annuity mode (project length 28.079 kms)

Access controlled highway of 4 lane with paved shoulders from walajapet/ ranipet (design chainage km 106.800) to tn/ ap border (design km 134.879) of nh40 in tamil nadu on hybrid annuity mode (project length 28.079 kms)

Read more
Access controlled highway of 4 lane with paved shoulders from marakkanam (design chainage km 62.000) to koonimedu (design chainage km 76.500) of nh-332a in tamil nadu on hybrid annuity mode (pl-14.5 kms) (mahabalipuram puducherry package-iii)

Access controlled highway of 4 lane with paved shoulders from marakkanam (design chainage km 62.000) to koonimedu (design chainage km 76.500) of nh-332a in tamil nadu on hybrid annuity mode (pl-14.5 kms) (mahabalipuram puducherry package-iii)

Read more
Access controlled greenfield highway of 4 lane with paved shoulders from koonimedu (design chainage km 76.500) to azhiyur (design chainage km 108.047) of nh-332a in tamil nadu on ham (project length 31.547 kms) (mahabalipuram puducherry package-iv)

Access controlled greenfield highway of 4 lane with paved shoulders from koonimedu (design chainage km 76.500) to azhiyur (design chainage km 108.047) of nh-332a in tamil nadu on ham (project length 31.547 kms) (mahabalipuram puducherry package-iv)

Read more
Consultancy services for consultant assisting ae for supervision of widening of existing road to 2 lane with ps configuration from km 0.0 to 26.0 and km 45.200 to 59.622 of nh 365bb in the state of andhra pradesh under annual plan 2023-24 on epc mode

Consultancy services for consultant assisting ae for supervision of widening of existing road to 2 lane with ps configuration from km 0.0 to 26.0 and km 45.200 to 59.622 of nh 365bb in the state of andhra pradesh under annual plan 2023-24 on epc mode

Read more
Access controlled highway of 4 lane with paved shoulders from design ch. 26.000 kammaragatta (hassan) to design ch 55.800 muddhenahalli in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o) project length 29.8 km (package 2)

Access controlled highway of 4 lane with paved shoulders from design ch. 26.000 kammaragatta (hassan) to design ch 55.800 muddhenahalli in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o) project length 29.8 km (package 2)

Read more
Access controlled highway of 4 lane with paved shoulders from design ch. 0.000 ranganathpura (hassan) to design ch 26.000 kammaragatta in hassan hiriyur section of ec-20 in karnataka on ham under nh (o) project length 26 kms (package 1)

Access controlled highway of 4 lane with paved shoulders from design ch. 0.000 ranganathpura (hassan) to design ch 26.000 kammaragatta in hassan hiriyur section of ec-20 in karnataka on ham under nh (o) project length 26 kms (package 1)

Read more
Access controlled highway of 4l with paved shoulder from dc 10.00 to dc 33.87 in bellary moka knt/ap border section of nh167 in karnataka on hybrid annuity mode under nh(o) (project length 23.870 km)

Access controlled highway of 4l with paved shoulder from dc 10.00 to dc 33.87 in bellary moka knt/ap border section of nh167 in karnataka on hybrid annuity mode under nh(o) (project length 23.870 km)

Read more
Access controlled highway of 4l with paved shoulder from mittimalkapur (dc 23.500) to deosugur (dc 54.566) in ap/kn border raichur kn/ts border sec of nh167 in karnataka on ham under nh(o) project length 31.06 km (pkg 2)

Access controlled highway of 4l with paved shoulder from mittimalkapur (dc 23.500) to deosugur (dc 54.566) in ap/kn border raichur kn/ts border sec of nh167 in karnataka on ham under nh(o) project length 31.06 km (pkg 2)

Read more
Access controlled highway of 4l with paved shoulder from ap/kn border (dc. 0.000) to mittimalkapur (dc. 23.500) in ap/kn border raichur kn/ts border sec of nh167 in karnataka on ham under nh(o) project length 23.5 km (pkg 1)

Access controlled highway of 4l with paved shoulder from ap/kn border (dc. 0.000) to mittimalkapur (dc. 23.500) in ap/kn border raichur kn/ts border sec of nh167 in karnataka on ham under nh(o) project length 23.5 km (pkg 1)

Read more
Access controlled highway of 4 lane with paved shoulders from design ch. 55.800 muddhenahalli to design ch 76.160 keresooragondanahalli in hassan hiriyur section ec20 in karnataka on ham under nh (o) project length 20.36 kms- (pkg 3)

Access controlled highway of 4 lane with paved shoulders from design ch. 55.800 muddhenahalli to design ch 76.160 keresooragondanahalli in hassan hiriyur section ec20 in karnataka on ham under nh (o) project length 20.36 kms- (pkg 3)

Read more

No attachments found

Get customized tender Recommendations for your Enterprise