Tender Details
Particulars | Details |
---|---|
Title |
C/O Road Bridge From Shani Dev Mandir To Towards Village Bandaus (G.P Gahli) Km 0/00 To 1/500
|
Description |
Rofd At Km 0/600 To 1/065, C/O R/Wall At Various Rds, P/L 900mm Dia Rcc Hume Pipe Culvert At Rd 0/150,0/300, 0/370 0/758, C/O Wire Crate R/Wall At Rd 0/810 To 0/840, V Shape Drain At Rd 0/00 To 0/495 0/600 To 1/065 P/L Gsb,Wmm M/T In Km 0/600 To
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_99934_1 |
Reference Number |
C/O road Bridge from Shani Dev mandir to towards village Bandaus (G.P Gahli) Km 0/00 to 1/500 |
Tender Fee | 2000 |
EMD | 77600 |
Tender Value | |
Place | Nadaun |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=146997 |
Start Date | February 14, 2025 16:00 |
End Date |
19/02/2025 ( Expired 80 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Read moreWidenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Widenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Read moreIe services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Read moreFdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Fdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreConsultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Consultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Read moreConstruction of bt road from charbhuja to saventri km 0/0 to 10/00 distt. rajsamand
Construction of bt road from charbhuja to saventri km 0/0 to 10/00 distt. rajsamand
Read moreUpgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i,2024-25 package no. an03mb308 (length 3.100 km).
Upgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i,2024-25 package no. an03mb308 (length 3.100 km).
Read moreAAAAAAAAAA
Login to viewConstruction of pcc road leading from&#x0d dasmohommad house to aroti mal house&#x0d around morol pond and pcc drain in/c cross drain near sitala maa mandir at sandhyajole&#x0d village under trda.
Read moreof your Industry type