Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Development/Upgradation Of Existing 4 Lane To 6 Lane Of Lucknow Sitapur Section Km 412.745 To Km 479.327 (Length 66.582 Km) Of New Nh30 In The State Of Uttar Pradesh On Bot (Toll) Mode
|
| Description |
Development/Upgradation Of Existing 4 Lane To 6 Lane Of Lucknow Sitapur Section Km 412.745 To Km 479.327 (Length 66.582 Km) Of New Nh30 In The State Of Uttar Pradesh On Bot (Toll) Mode
|
| Organisation | National Highways Authority of India | Head Office - NHAI | Technical - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 1.2 Lakh |
| EMD | 11.23 Crore |
| Tender Value | 1123.24 Crore |
| Place | |
| Link | Login to view |
| Start Date | August 04, 2026 19:00 |
| End Date |
Closing soon
22/10/2026
3 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreIe services for construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km on bot (toll) mode in the state of kerala.
Ie services for construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km on bot (toll) mode in the state of kerala.
Read moreWidening to 6laning of nagpur wainganga section of nh53 from km 541.800 to km 499.800 in the state of maharashtra on bot toll mode length 42.00 km under nh o
Widening to 6laning of nagpur wainganga section of nh53 from km 541.800 to km 499.800 in the state of maharashtra on bot toll mode length 42.00 km under nh o
Read moreCs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreConstruction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode
Construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of six lane greenfield highway starting from its junction with nh4b (new nh348) near pagote (design km. 0.000) till its junction on nh48 at chowk (design km. 29.219) in maharashtra to be executed on bot (toll) mode under nh(o)
Construction of six lane greenfield highway starting from its junction with nh4b (new nh348) near pagote (design km. 0.000) till its junction on nh48 at chowk (design km. 29.219) in maharashtra to be executed on bot (toll) mode under nh(o)
Read moreWidening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
Read moreof your Industry type