Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening To 6 Laning Of Nagpur Wainganga Section Of Nh53 From Km 541.800 To Km 499.800 In The State Of Maharashtra On Bot Toll Mode Length 42.00 Km Under Nh O
|
| Description |
Widening To 6 Laning Of Nagpur Wainganga Section Of Nh53 From Km 541.800 To Km 499.800 In The State Of Maharashtra On Bot Toll Mode Length 42.00 Km Under Nh O
|
| Organisation | National Highways Authority of India | Head Office - NHAI | Technical - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 2.6 Lakh |
| EMD | 25.54 Crore |
| Tender Value | 2553.84 Crore |
| Place | |
| Link | Login to view |
| Start Date | October 09, 2026 23:30 |
| End Date |
Open
26/11/2026
44 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreIe for (pkg1) dev of 6l access controlled greenfield highway starting from junction with nh-60 at adgaon (km. 138.00) to ahilyanagar (km. 290.000) to start of ahilyanagar bypass (km. 126.564) of nh-160 in maharashtra on bot (toll) mode 2nd call
Ie for (pkg1) dev of 6l access controlled greenfield highway starting from junction with nh-60 at adgaon (km. 138.00) to ahilyanagar (km. 290.000) to start of ahilyanagar bypass (km. 126.564) of nh-160 in maharashtra on bot (toll) mode 2nd call
Read moreIe services for construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km on bot (toll) mode in the state of kerala.
Ie services for construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km on bot (toll) mode in the state of kerala.
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreConstruction of six lane greenfield highway ing from its junction with nh4b (new nh348) near pagote (design km. 0.000) till its junction on nh48 at chowk (design km. 29.219) in maharashtra to be d on bot (toll) mode under nh(o)
Construction of six lane greenfield highway ing from its junction with nh4b (new nh348) near pagote (design km. 0.000) till its junction on nh48 at chowk (design km. 29.219) in maharashtra to be d on bot (toll) mode under nh(o)
Read moreIe services for (pkg-2) cons.of 6l access controlled greenfield highway from ahilyanagar (km 290.000) to hasapur (km 512.000) in the state of maharashtra on bot (toll) mode 2nd call
Ie services for (pkg-2) cons.of 6l access controlled greenfield highway from ahilyanagar (km 290.000) to hasapur (km 512.000) in the state of maharashtra on bot (toll) mode 2nd call
Read moreDevelopment/upgradation of existing 4 lane to 6 lane of lucknow sitapur section km 412.745 to km 479.327 (length 66.582 km) of new nh30 in the state of uttar pradesh on bot (toll) mode
Development/upgradation of existing 4 lane to 6 lane of lucknow sitapur section km 412.745 to km 479.327 (length 66.582 km) of new nh30 in the state of uttar pradesh on bot (toll) mode
Read moreCs for ie services for development of 4 lane badvel to nellore highway from badvel gopavaram village on nh nh-67 (ch.630.960) to guruvindapudi village on nh-16 (ch.739.094) in andhra pradesh on build-operate-transfer (toll) mode for a tl 108.134 km.
Cs for ie services for development of 4 lane badvel to nellore highway from badvel gopavaram village on nh nh-67 (ch.630.960) to guruvindapudi village on nh-16 (ch.739.094) in andhra pradesh on build-operate-transfer (toll) mode for a tl 108.134 km.
Read moreof your Industry type