Tender Details

Particulars Details
Title
Ttps Mech Ii Tm Ii Unit Iv Inspection And Rectification Of Epoxy Cladding Over The Condenser Water Box And Tube Sheet East And West And Rebuild The Cladding With Special Epoxy Putties Ie Average 4 5mm Thick To Be Built Up In The Peeled Off Area Of C
Description
Ttps Mech Ii Tm Ii Unit Iv Inspection And Rectification Of Epoxy Cladding Over The Condenser Water Box And Tube Sheet East And West And Rebuild The Cladding With Special Epoxy Putties Ie Average 4 5mm Thick To Be Built Up In The Peeled Off Area Of C
Organisation TNEB Limited | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 4200
Tender Value
Place TTPS
Link

AAAAAAAAAA

Login to view
Start Date July 09, 2025 23:30
End Date

25/07/2025 ( 14 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps mech ii tm ii unit iv kwu turbine overhauling of condenser water box vent drain valves and mal valves during annual overhaul 2025 2026

Ttps mech ii tm ii unit iv kwu turbine overhauling of condenser water box vent drain valves and mal valves during annual overhaul 2025 2026

Read more
Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of c

Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of c

Read more
Ttps mech ii tm ii unit iv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2025 26

Ttps mech ii tm ii unit iv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat

Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat

Read more
Ttps mech ii tm i unit iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during annual overhau

Ttps mech ii tm i unit iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during annual overhau

Read more
Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26

Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26

Read more
Ttps mech ii tm i units i ii iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning 01 04 25 to 31

Ttps mech ii tm i units i ii iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning 01 04 25 to 31

Read more
Ttps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26

Ttps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26

Read more
Ttps mech ii tm ii kwu turbine unit iv v breakdown maintenance works in condenser hpbp valve lpt diaphragm and attending high pressure steam pipe lines punctures for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm ii kwu turbine unit iv v breakdown maintenance works in condenser hpbp valve lpt diaphragm and attending high pressure steam pipe lines punctures for the period from 01 04 2025 to 31 03 2026

Read more
Mtps i tm unit ii inspection of condensertubes flaring and torque setting by using special tools tube sheets cleaning degreasing and epoxy coating to the thickness of 1500 microns on condenser tube sheets of the condenser and cleaning sand blasting

Mtps i tm unit ii inspection of condenser tubes flaring and torque setting by using special tools tube sheets cleaning degreasing and epoxy coating to the thickness of 1500 microns on condenser tube sheets of the condenser and cleaning sand blasting

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise