Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Tm I Units I Ii Iii Conducting Tube Cleaning In The Surface Of The Condenser For Its Entire 10 02m Length Using A Flexible Hose Fitted With Nylon Brush And Fine Water Tube Jet Arrangement Subsequent Jet Cleaning 01 04 25 To 31
|
Description |
Ttps Mech Ii Tm I Units I Ii Iii Conducting Tube Cleaning In The Surface Of The Condenser For Its Entire 10 02m Length Using A Flexible Hose Fitted With Nylon Brush And Fine Water Tube Jet Arrangement Subsequent Jet Cleaning 01 04 25 To 31
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527586_1 |
Reference Number |
CE/TTPS/SE/M-II/No.43/2025-26 |
Tender Fee | 0 |
EMD | 9100 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628239 |
Start Date | February 24, 2025 23:30 |
End Date |
12/03/2025 ( Expired 40 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii tm i units i ii iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning 01 04 25 to 31
Ttps mech ii tm i units i ii iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning 01 04 25 to 31
Read moreTtps mech ii tm i breakdown works in boiler feed water system stator water primary secondary pumps hydrogen cooler booster pumps, chemical dosing pumps and connected cooling water lines in units i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i breakdown works in boiler feed water system stator water primary secondary pumps hydrogen cooler booster pumps, chemical dosing pumps and connected cooling water lines in units i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii tm ii unit iv v clearing the coal ash dust from the 0mtr repair bay floor turbine 5mtr 7 5mtr 10 5 mtr floor area condenser pit sump pit cleaning work for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm ii unit iv v clearing the coal ash dust from the 0mtr repair bay floor turbine 5mtr 7 5mtr 10 5 mtr floor area condenser pit sump pit cleaning work for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit i to v attending boiler tube puncture in unit i to v boiler for a period from 01 04 2025 to 31 03 2026 or till the date of completion of entire quantity which ever comes earlier
Ttps mech ii bm unit i to v attending boiler tube puncture in unit i to v boiler for a period from 01 04 2025 to 31 03 2026 or till the date of completion of entire quantity which ever comes earlier
Read moreMtps i tm unit ii inspection of condensertubes flaring and torque setting by using special tools tube sheets cleaning degreasing and epoxy coating to the thickness of 1500 microns on condenser tube sheets of the condenser and cleaning sand blasting
Mtps i tm unit ii inspection of condenser tubes flaring and torque setting by using special tools tube sheets cleaning degreasing and epoxy coating to the thickness of 1500 microns on condenser tube sheets of the condenser and cleaning sand blasting
Read moreTtps mechii tm i uniti conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during annual overhaul 20
Ttps mechii tm i uniti conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during annual overhaul 20
Read moreTtps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Read moreTtps mech ii tm i unit iii inspection painting overhauling of condenser cw pipelines hotwells etc during annual overhaul 2024 2025
Ttps mech ii tm i unit iii inspection painting overhauling of condenser cw pipelines hotwells etc during annual overhaul 2024 2025
Read moreTtps mech ii tm i unit iii condenser repairing and arresting the leak points in the longitudinal bellows and side walls of lpt exhaust hood during annual overhaul 2024 2025
Ttps mech ii tm i unit iii condenser repairing and arresting the leak points in the longitudinal bellows and side walls of lpt exhaust hood during annual overhaul 2024 2025
Read moreof your Industry type