Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Complete Rob (Railway Portion (Except Steel Girder) Approach Road In State Portion) &Amp Limited Height Subway In Lieu Of Lc 20 Spl. At Km 236/4 5 At Kachhwa Road Phatak In Varanasi Division Of N.E. Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73691371 |
|
Reference Number |
DYCEC1BSB-2024-01 |
| Tender Fee | 0 |
| EMD | 20.29 Lakh |
| Tender Value | - |
| Place | Gorakhpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73691371/viewNitPdf_4486248.pdf |
| Start Date | February 19, 2024 20:35 |
| End Date |
Expired
14/03/2024
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read more1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
Read moreConstruction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreConstruction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Read more(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read moreConstruction of complete rob & limited height subway in lieu of lc 4 (railway portion except steel girder approach road in state portion) at km 60/23-25 in indara yard, lc 67c (railway portion including steel girder approach road in state portion) at km 95/273 between kkt-pou section & lc 115 (only railway portion including bow string girder) at km 433/723 in btt yard of varanasi division in n. e. railway
For complete deion and other details, please refer to tender
Read moreof your Industry type