Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 2 Lane Rob In Lieu Of Lc No.38 At Km 65/300 400 With 1x42m Bowstring Girder ( Railway Portion) 08x18.71m Psc Girder Towards Nh 73 Baddihalli Side And 5x18.71m Psc Girder Towards Nh 43 Side And Retaining Wall On Both Sides Of Rob Merging Lengths Between Kyathasandra And Tumakur Stations Including Electrical Works (Composite Work).
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79215149 |
Reference Number |
ROB-LC38-KIAT-TK |
Tender Fee | 0 |
EMD | 14.23 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79215149/viewNitPdf_4816660.pdf |
Start Date | January 16, 2025 20:51 |
End Date |
11/02/2025 ( Expired 68 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4 lane rob including railway portion with n type steel girder and composite girder on pile foundation. psc girder on pile foundation and reinforced earth (re) wall in approaches in lieu of lc no. 25-b at rly. km 591/6-7 between jatpipli -bajana stations on viramgam - samakhiyali section of ahmedabad division of western railway under gati shakti unit, ahmedabad.
For complete deion and other details, please refer to tender
Read moreTumkuru-arsikere section: proposed construction of rob in lieu of lc no. 88 at km:149/900-150/000 with 1x30m bow-string girder and 2x18.71m psc girder re blocks (approach span) between tiptur and honnavalli road stations.
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge with subway in lieu of level crossing no.86 as 1x30m composite girder with 8x18m psc girder towards hassan side and 8x18m psc girder towards nh side at railway km.142/700-800 between tiptur and honnavalli road stations in tumakuru- arsikere section.(composite work).
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.38 at km 65/300-400 with 1x42m bowstring girder ( railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 5x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations including electrical works (composite work).
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no .39 at km 66/200-300 with 1x42m bowstring girder (railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 17x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations and proposed construction of lhs in lieu of lc 39 at km 66/200-300 as 1x5.5x2.5m rcc box including electrical works (composite work)
For complete deion and other details, please refer to tender
Read moreLonda-miraj section-construction of rob at km.613/800-900 in lieu of lc no 392 between belagavi-sambre station as 1x36m composite girder clear span ( railway portion) with 5x18.71m psc girder (nh end) and 6x18.71 m psc girder (mutaga end) and cc block in approaches between belagavi and sambre stations.(composite work)
For complete deion and other details, please refer to tender
Read moreLonda-miraj section- balance works of proposed construction of rob at km. 607/893 in lieu of lc no. 381, 1x54m bow-string girder (railway portion) 12x18m psc girder & cc block as approaches between desur and belagavi stations (composite work)
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.35 at km. 62/400-500 with 1x60m bowstring girder (railway portion) 10x18.71m psc girder24.945 mtr psc solid slab towards nh-48 side and 6x18.71m psc girder1x16.33 mtr psc solid slab towards mydala side and retaining wall on both sides of rob merging lengths between kyathasandra and nidavanda stations and construction of lhs in lieu of lc 35 at km 62/400-500 as 1x5.5x2.5m rcc box including electrical works- composite work.
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.46 (manned) at km:78/340 with 1x42m bow string girder in mallasandra yard and construction of limited height subway of size 5.5x2.5m between tumkuru-mallasandra stations (composite work)
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.58 ( manned) at km:95/850 with 1x30m composite girder with 23x18.71m psc girder (nittur end) 8x18.71m psc girder (harnahalli end) rcc retaining wall (approach span) and construction of limited high sub-way of size 5.5x2.5m between nittur-gubbi stations. (composite work).
For complete deion and other details, please refer to tender