Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 2 Lane Rob In Lieu Of Lc No .39 At Km 66/200 300 With 1x42m Bowstring Girder (Railway Portion) 08x18.71m Psc Girder Towards Nh 73 Baddihalli Side And 17x18.71m Psc Girder Towards Nh 43 Side And Retaining Wall On Both Sides Of Rob Merging Lengths Between Kyathasandra And Tumakur Stations And Proposed Construction Of Lhs In Lieu Of Lc 39 At Km 66/200 300 As 1x5.5x2.5m Rcc Box Including Electrical Works (Composite Work)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78963961 |
Reference Number |
ROB-LC-39-KIAT-TK |
Tender Fee | 0 |
EMD | 21.62 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78963961/viewNitPdf_4803145.pdf |
Start Date | December 19, 2024 18:09 |
End Date |
10/01/2025 ( Expired 100 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of complete rob & limited height subway in lieu of lc 4 (railway portion except steel girder approach road in state portion) at km 60/23-25 in indara yard, lc 67c (railway portion including steel girder approach road in state portion) at km 95/273 between kkt-pou section & lc 115 (only railway portion including bow string girder) at km 433/723 in btt yard of varanasi division in n. e. railway
For complete deion and other details, please refer to tender
Read moreHubballi division- hubballi-ballari section: 1) construction of subway at km 117/000-100 in lieu of lc no.66 at km.117/600-700 between koppal and ginigera stations (balance works). 2) construction of subway in lieu of lc no.62 at km 116/100-200 between koppal and ginigera stations (balance works)
For complete deion and other details, please refer to tender
Read moreConstruction of 4 lane rob including railway portion with n type steel girder and composite girder on pile foundation. psc girder on pile foundation and reinforced earth (re) wall in approaches in lieu of lc no. 25-b at rly. km 591/6-7 between jatpipli -bajana stations on viramgam - samakhiyali section of ahmedabad division of western railway under gati shakti unit, ahmedabad.
For complete deion and other details, please refer to tender
Read moreConstruction of rob with(1x60 mtr bow string girder 2 x 18.0 mtr composite girder 11 x 24.0 mtr t- beam girder and approaches of existing special class (manned and inter-locked) lc- 463 at km: 821/9-11, 821/10-12 up and dn between vizianagaram- korukonda station of waltair division.
For complete deion and other details, please refer to tender
Read moreA. construction of proposed rob (road over bridge) & lhs (limited height subway) in lieu of lc gate no. 36a at km 136/16-17 in pune-lonavala section. b. construction of proposed rob (road over bridge) & lhs (limited height subway) in lieu of lc gate no. 45 at km 148.600 in pune lonavala section. c. construction of proposed rob (road over bridge) & lhs (limited height subway) in lieu of lc gate no. 08 at km 218/4-5 in pune-daund section. d. construction of proposed lhs (limited hei
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works, in connection with following works: (1)construction of rob at km. 662/18-19 at badnera station. (2)construction of rob & lhs in lieu of lc no. s-2 at km. 666/07-08 on badnera-amravati section.
For complete deion and other details, please refer to tender
Read moreDesign, drawing, modification, supply, erection, testing and commissioning of 25kv ohe for proposed garhwa phase-ii and removal of ohe infringement work in connection to rob in lieu of lc 39/spl/t at km. 120/03-05 between bhurkunda - patratu, 35/b/t (s&t no. 13/b/t) at km. 217/10-12 between demu - latehar & others rub/ lhs ( 4/c/e, 5/c/t, 6/c/t, 7/c/e, 10a/c/e, 11/c/t, 16/c/e, 17/c/t, 19/c/e, 24/c/t, 26/c/t, 38/spl/e, 28/c/e, etc) under dhanbad division under dy.cee/c/s/mhx
For complete deion and other details, please refer to tender
Read moreTumkuru-arsikere section: proposed construction of rob in lieu of lc no. 88 at km:149/900-150/000 with 1x30m bow-string girder and 2x18.71m psc girder re blocks (approach span) between tiptur and honnavalli road stations.
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge with subway in lieu of level crossing no.86 as 1x30m composite girder with 8x18m psc girder towards hassan side and 8x18m psc girder towards nh side at railway km.142/700-800 between tiptur and honnavalli road stations in tumakuru- arsikere section.(composite work).
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.38 at km 65/300-400 with 1x42m bowstring girder ( railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 5x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations including electrical works (composite work).
For complete deion and other details, please refer to tender
Read moreof your Industry type