Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Structural Design And Drawings For Proposed Construction Of New 23 Ro Bs, 61 Psc Slab/Girder Bridges On Mmr Jl 4th Line, 106 Psc Slab/Girder Bridges And 1 Important Bridge On Bsl Knw 3rd &Amp 4th Line On Bhusawal Division Of Central Railway
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79595795 |
|
Reference Number |
DyCECBSL-06-2024-25 |
| Tender Fee | 0 |
| EMD | 4.45 Lakh |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79595795/viewNitPdf_4836557.pdf |
| Start Date | January 17, 2025 03:14 |
| End Date |
Expired
07/02/2025
Expired 616 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.
Replacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreRebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.
Rebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.
Read moreShoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Read moreOhe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.
Ohe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.
Read moreProvision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.
Provision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.
Read moreConstruction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Read moreOhe modification work in connection with replacement of steel girder by psc slab at bridge no. 31dn & 76dn and providing extra water way at bridge no. 60 under aden(vya) section in udn-jl section of mumbai division of western railway.
Ohe modification work in connection with replacement of steel girder by psc slab at bridge no. 31dn & 76dn and providing extra water way at bridge no. 60 under aden(vya) section in udn-jl section of mumbai division of western railway.
Read moreStructural design and drawings for proposed construction of new 23 robs, 61 psc slab/girder bridges on mmr-jl 4th line, 106 psc slab/girder bridges and 1 important bridge on bsl-knw 3rd & 4th line on bhusawal division of central railway
For complete deion and other details, please refer to tender
Read moreof your Industry type