Tender Details
Particulars | Details |
---|---|
Title |
Londa Miraj Section: Proposed Construction Of Rob At Km. 553/300 400 In Lieu Of Lc No. 331 Of Span 1x36m Composite Girder (Railway Portion) 20 X18m Psc Girder &Amp Cc Blocks With Geo Grid (Approach Portion) Between Alnaand Tavaragatti Stations.(Composite Work)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77656512 |
Reference Number |
LD-MRJ-ROB-LC-331 |
Tender Fee | 0 |
EMD | 20.58 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77656512/viewNitPdf_4728760.pdf |
Start Date | October 17, 2024 21:34 |
End Date |
08/11/2024 ( Expired 164 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreConstruction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Construction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Read moreConstruction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Construction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Read moreConstruction of complete rob & limited height subway in lieu of lc 4 (railway portion except steel girder approach road in state portion) at km 60/23-25 in indara yard, lc 67c (railway portion including steel girder approach road in state portion) at km 95/273 between kkt-pou section & lc 115 (only railway portion including bow string girder) at km 433/723 in btt yard of varanasi division in n. e. railway
For complete deion and other details, please refer to tender
Read moreConstruction of 4 lane rob including railway portion with n type steel girder and composite girder on pile foundation. psc girder on pile foundation and reinforced earth (re) wall in approaches in lieu of lc no. 25-b at rly. km 591/6-7 between jatpipli -bajana stations on viramgam - samakhiyali section of ahmedabad division of western railway under gati shakti unit, ahmedabad.
For complete deion and other details, please refer to tender
Read moreConstruction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Construction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Read moreTumkuru-arsikere section: proposed construction of rob in lieu of lc no. 88 at km:149/900-150/000 with 1x30m bow-string girder and 2x18.71m psc girder re blocks (approach span) between tiptur and honnavalli road stations.
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge with subway in lieu of level crossing no.86 as 1x30m composite girder with 8x18m psc girder towards hassan side and 8x18m psc girder towards nh side at railway km.142/700-800 between tiptur and honnavalli road stations in tumakuru- arsikere section.(composite work).
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.38 at km 65/300-400 with 1x42m bowstring girder ( railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 5x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations including electrical works (composite work).
For complete deion and other details, please refer to tender
Read moreof your Industry type