Tender Details

Particulars Details
Title
Construction Of Complete Rob &Amp Limited Height Subway In Lieu Of Lc 4 (Railway Portion Except Steel Girder Approach Road In State Portion) At Km 60/23 25 In Indara Yard, Lc 67 C (Railway Portion Including Steel Girder Approach Road In State Portion) At Km 95/273 Between Kkt Pou Section &Amp Lc 115 (Only Railway Portion Including Bow String Girder) At Km 433/723 In Btt Yard Of Varanasi Division In N. E. Railway
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79941395
Reference
Number
DYCEC1BSB-2025-01
Tender Fee 0
EMD 64.57 Lakh
Tender Value -
Place Gorakhpur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/032025/79941395/viewNitPdf_4855504.pdf

Start Date February 13, 2025 02:12
End Date
Expired 10/03/2025

Expired 586 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Read more
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Read more
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc

Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc

Read more
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Read more
Design, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.

Design, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.

Read more
Two years maintenance contract for railway track leading to tuna from 0 to 11 km dpa line (take off point at 2.573km at gim yard to 13.54km) including lc-1, lc-2 (from 2026-28)

Two years maintenance contract for railway track leading to tuna from 0 to 11 km dpa line (take off point at 2.573km at gim yard to 13.54km) including lc-1, lc-2 (from 2026-28)

Read more
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in

Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in

Read more
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:

1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:

Read more
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway

Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway

Read more
(i) dhapdhapi (dpdp) yard remodeling. (ii) at nischindapur: provision of over run-line (120 m) & extension of existing loop line at nischindapur. (iii) at baruipur: repairs to damaged station approach area including road connected to lc gates in side railway premises with all other ancillary works under assistant engineer/baruipur.

(i) dhapdhapi (dpdp) yard remodeling. (ii) at nischindapur: provision of over run-line (120 m) & extension of existing loop line at nischindapur. (iii) at baruipur: repairs to damaged station approach area including road connected to lc gates in side railway premises with all other ancillary works under assistant engineer/baruipur.

Read more
Click Here to Download Dockets
of your Industry type