Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Iv Dismantling Hard Facing And Assembling Of 1mtr Length Coal Pipes After Moe Mill Outlet Elbow In Mill 4 A To 4 D During Aoh 2024 25
|
Description |
Mtps I Mill Plant Unit Iv Dismantling Hard Facing And Assembling Of 1mtr Length Coal Pipes After Moe Mill Outlet Elbow In Mill 4 A To 4 D During Aoh 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_465390_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.131/ 2024-25 |
Tender Fee | 0 |
EMD | 6800 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=553021 |
Start Date | July 23, 2024 23:00 |
End Date |
29/07/2024 ( Expired 333 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Mtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Read moreMtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Mtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Read moreMtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Mtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Mtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreMtps i bm unit i boiler pressure parts aoh 2025 reconditioning and hard facing of used and wornout square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Mtps i bm unit i boiler pressure parts aoh 2025 reconditioning and hard facing of used and wornout square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Read moreMtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Mtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines