Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit I Fabrication Of Ms Bend 10 Deg 15 Deg 22 Deg To Suit 508 Mm 12 70 Mm Thick Coal Pipe Line During Aoh 2025 26
|
Description |
Mtps I Mill Plant Unit I Fabrication Of Ms Bend 10 Deg 15 Deg 22 Deg To Suit 508 Mm 12 70 Mm Thick Coal Pipe Line During Aoh 2025 26
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_564978_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.125/ 2025-26 |
Tender Fee | 0 |
EMD | 3200 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=674620 |
Start Date | June 04, 2025 23:00 |
End Date |
18/06/2025 ( Expired 9 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i se m ii circle ahp dn unit i aoh 2025 26 bah reconditioning of 550 890 mm dia mixing apparatus during overhaul of unit
Nctps i se m ii circle ahp dn unit i aoh 2025 26 bah reconditioning of 550 890 mm dia mixing apparatus during overhaul of unit
Read moreMtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Mtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Read moreMtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Read moreMtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Mtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Read moreMtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Mtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtpsi mill plant unit i overhauling of classifier assemblies replacement repairing of eroded cone cone drum section venture vanes venturi collars during aoh 2025 26
Mtpsi mill plant unit i overhauling of classifier assemblies replacement repairing of eroded cone cone drum section venture vanes venturi collars during aoh 2025 26
Read moreMtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Mtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreof your Industry type