Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Iv Fabrication Of Ms Bend 15 Degree 22 Degree To Suit Dia 508 Mm X 12.7 Mm Thick Coal Pipe Line During Aoh 2023 24
|
| Description |
Mtps I Mill Plant Unit Iv Fabrication Of Ms Bend 15 Degree 22 Degree To Suit Dia 508 Mm X 12.7 Mm Thick Coal Pipe Line During Aoh 2023 24
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_329136_1 |
|
Reference Number |
CE / MTPS-I / SE/ M-I / MP/ OT. 185/ 2023-24 |
| Tender Fee | 0 |
| EMD | 2900 |
| Tender Value | - |
| Place | Office of the Superintending Engineer /M-I/MTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | June 19, 2023 21:30 |
| End Date |
Expired
03/07/2023
Expired 1201 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii hard facing of ms bend and multiple port outlets in coal flow lines fabrication of ms bend 10 11 15 22 23 deg to suit dia 508 mm 12 7 mm thick coal pipe line during aoh 2026 27
Mtps i mill plant unit ii hard facing of ms bend and multiple port outlets in coal flow lines fabrication of ms bend 10 11 15 22 23 deg to suit dia 508 mm 12 7 mm thick coal pipe line during aoh 2026 27
Read moreMtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Read moreMtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27
Mtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i mill plant ac plant unit ii aoh 2026 27 air washer system epoxy painting of blowers and its auxiliaries fabrication of ms tank for cleaning of w type eliminators spray nozzles flushing works providing handrails in air washer circulating
Mtps i mill plant ac plant unit ii aoh 2026 27 air washer system epoxy painting of blowers and its auxiliaries fabrication of ms tank for cleaning of w type eliminators spray nozzles flushing works providing handrails in air washer circulating
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Read moreMtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Mtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover etc
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and rectification of critical pipe line of crh etc
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreof your Industry type