Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit I Dismantling The Eroded 90 Degree Ceralin Coal Bends From Coal Pipe Lines And Reconditioning The Released One And Then Assembling The Reconditioned Bends In An Appropriate Manner In The Coal Flow System
|
| Description |
Mtps I Mill Plant Unit I Dismantling The Eroded 90 Degree Ceralin Coal Bends From Coal Pipe Lines And Reconditioning The Released One And Then Assembling The Reconditioned Bends In An Appropriate Manner In The Coal Flow System
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_565007_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.126/ 2025-26 |
| Tender Fee | 0 |
| EMD | 8100 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=674642 |
| Start Date | June 04, 2025 23:30 |
| End Date |
Expired
18/06/2025
Expired 482 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreMtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Read moreMtps i mill plant unit iv dismantling the eroded 90degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system during annual overhaul
Mtps i mill plant unit iv dismantling the eroded 90degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system during annual overhaul
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2025
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2025
Read moreMtps i mill plant unit iv applying two layers ceramic wear coat eromat at mill outlet elbows ceramic 90deg bends 75 deg ceralin bends ceralin 60 deg bends 45 deg ceralin bends and multiple port outlet are released from unit iv during aoh
Mtps i mill plant unit iv applying two layers ceramic wear coat eromat at mill outlet elbows ceramic 90deg bends 75 deg ceralin bends ceralin 60 deg bends 45 deg ceralin bends and multiple port outlet are released from unit iv during aoh
Read moreMtps i mill plant unit iv dismantling and assembling of coal pipes with bends and releasing bends for reconditioning of the eroded portion and patch welding of coal bends coal pipes and renewal of eroded pipes of length at about 15mtr length
Mtps i mill plant unit iv dismantling and assembling of coal pipes with bends and releasing bends for reconditioning of the eroded portion and patch welding of coal bends coal pipes and renewal of eroded pipes of length at about 15mtr length
Read moreMtps i mill plant unit iv dismantling of fuel inlet elbow short fuel inlet elbows long renewal of eroded fie short hard facing of released fuel inlet elbows long short and then assembling of fuel inlet elbows during annual overhaul 2025 26
Mtps i mill plant unit iv dismantling of fuel inlet elbow short fuel inlet elbows long renewal of eroded fie short hard facing of released fuel inlet elbows long short and then assembling of fuel inlet elbows during annual overhaul 2025 26
Read moreMtps i mill plant unit iv dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2024 25
Mtps i mill plant unit iv dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2024 25
Read moreof your Industry type