Tender Details
Particulars | Details |
---|---|
Title |
Tn 5388 Measurement Of Various Parameter Of Esp Of Any One Unit Of Stage Ii (Unit 3 And 4 Of 210 Mw) During Running As Well As Shutdown Condition And Prepare And Submit Its Report.
|
Description |
Measurement Of Various Parameter Of Esp Of Any One Unit Of Stage Ii (Unit 3 And 4 Of 210 Mw) During Running As Well As Shutdown Condition And Prepare And Submit Its Report.
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id | 2025_RRVUN_453295_1 |
Reference Number |
TN-5388 |
Tender Fee | 1090 |
EMD | 12800 |
Tender Value | |
Place | Kota Super Thermal Power Station |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=813708 |
Start Date | March 20, 2025 17:30 |
End Date |
24/04/2025 ( Expired 23 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of l and t make spare contact kit, coil of different power auxiliary contactor, breaker installed at unit 3 and 4, sstpp, stage-ii, dongalia, khandwa on open offer basis with single make of l and t only/etni-ii
Procurement of l and t make spare contact kit, coil of different power auxiliary contactor, breaker installed at unit 3 and 4, sstpp, stage-ii, dongalia, khandwa on open offer basis with single make of l and t only
Read moreProcurement of l and t howden make stall dp probe installed in id fans in boiler area of unit 3 and 4, 2x660 mw, sstpp, stage-ii, mppgcl, dongalia/etni-ii
Procurement of l and t howden make stall dp probe installed in id fans in boiler area of unit 3 and 4, 2x660 mw, sstpp, stage-ii, mppgcl, dongalia
Read moreInsulation of various area of boiler esp mills fan and turbine of various division bmd-i bmd-ii and tmd during overhauling of unit 9 dtps kasimpur
Insulation of various area of boiler esp mills fan and turbine of various division bmd-i bmd-ii and tmd during overhauling of unit 9 dtps kasimpur
Read moreTn-5388 measurement of various parameter of esp of any one unit of stage ii (unit 3 and 4 of 210mw) during running as well as shutdown condition and prepare and submit its report.
Measurement of various parameter of esp of any one unit of stage ii (unit 3 and 4 of 210mw) during running as well as shutdown condition and prepare and submit its report.
Read moreAnnual work contract for providing assistance in collection, preparation and transportation of various coal samples of ph-i (unit 1 and unit 2) and ph-ii (unit 3 and unit 4) at sstpp, mppgcl, dongalia, khandwa for a period of 12 months
Annual work contract for providing assistance in collection, preparation and transportation of various coal samples of ph-i (unit 1 and unit 2) and ph-ii (unit 3 and unit 4) at sstpp, mppgcl, dongalia, khandwa for a period of 12 months
Read moreTn-5385 post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota
Post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota
Read morePoking of silo unloading telescopic chutes to facilitate smooth unloading of ash from silo along with poking of esp aph and silo hoppers of unit 3 and 4 for 4 months under ahp operation ii
Poking of silo unloading telescopic chutes to facilitate smooth unloading of ash from silo along with poking of esp aph and silo hoppers of unit 3 and 4 for 4 months under ahp operation ii
Read moreAnnual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Read moreBeautification of walking path and illumination in various parks in sector 1 and 4 at hisar (including 3 years defect liability period of led, mtc., on/off operation of led light as well as 3 years defect liability period for all other items free of
Beautification of walking path and illumination in various parks in sector 1 and 4 at hisar (including 3 years defect liability period of led, mtc., on/off operation of led light as well as 3 years defect liability period for all other items free of
Read morePicking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Read moreof your Industry type