Tender Details

Particulars Details
Title
Tn 5388 Measurement Of Various Parameter Of Esp Of Any One Unit Of Stage Ii (Unit 3 And 4 Of 210 Mw) During Running As Well As Shutdown Condition And Prepare And Submit Its Report.
Description
Measurement Of Various Parameter Of Esp Of Any One Unit Of Stage Ii (Unit 3 And 4 Of 210 Mw) During Running As Well As Shutdown Condition And Prepare And Submit Its Report.
Organisation RRVUN - CMD | State Govt. and UT
Tender Id 2025_RRVUN_453295_1
Reference
Number
TN-5388
Tender Fee 1090
EMD 12800
Tender Value
Place Kota Super Thermal Power Station
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=813708
Start Date March 20, 2025 17:30
End Date

24/04/2025 ( Expired 23 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of l and t make spare contact kit, coil of different power auxiliary contactor, breaker installed at unit 3 and 4, sstpp, stage-ii, dongalia, khandwa on open offer basis with single make of l and t only/etni-ii

Procurement of l and t make spare contact kit, coil of different power auxiliary contactor, breaker installed at unit 3 and 4, sstpp, stage-ii, dongalia, khandwa on open offer basis with single make of l and t only

Read more
Procurement of l and t howden make stall dp probe installed in id fans in boiler area of unit 3 and 4, 2x660 mw, sstpp, stage-ii, mppgcl, dongalia/etni-ii

Procurement of l and t howden make stall dp probe installed in id fans in boiler area of unit 3 and 4, 2x660 mw, sstpp, stage-ii, mppgcl, dongalia

Read more
Insulation of various area of boiler esp mills fan and turbine of various division bmd-i bmd-ii and tmd during overhauling of unit 9 dtps kasimpur

Insulation of various area of boiler esp mills fan and turbine of various division bmd-i bmd-ii and tmd during overhauling of unit 9 dtps kasimpur

Read more
Tn-5388 measurement of various parameter of esp of any one unit of stage ii (unit 3 and 4 of 210mw) during running as well as shutdown condition and prepare and submit its report.

Measurement of various parameter of esp of any one unit of stage ii (unit 3 and 4 of 210mw) during running as well as shutdown condition and prepare and submit its report.

Read more
Annual work contract for providing assistance in collection, preparation and transportation of various coal samples of ph-i (unit 1 and unit 2) and ph-ii (unit 3 and unit 4) at sstpp, mppgcl, dongalia, khandwa for a period of 12 months

Annual work contract for providing assistance in collection, preparation and transportation of various coal samples of ph-i (unit 1 and unit 2) and ph-ii (unit 3 and unit 4) at sstpp, mppgcl, dongalia, khandwa for a period of 12 months

Read more
Tn-5385 post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota

Post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota

Read more
Poking of silo unloading telescopic chutes to facilitate smooth unloading of ash from silo along with poking of esp aph and silo hoppers of unit 3 and 4 for 4 months under ahp operation ii

Poking of silo unloading telescopic chutes to facilitate smooth unloading of ash from silo along with poking of esp aph and silo hoppers of unit 3 and 4 for 4 months under ahp operation ii

Read more
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Read more
Beautification of walking path and illumination in various parks in sector 1 and 4 at hisar (including 3 years defect liability period of led, mtc., on/off operation of led light as well as 3 years defect liability period for all other items free of

Beautification of walking path and illumination in various parks in sector 1 and 4 at hisar (including 3 years defect liability period of led, mtc., on/off operation of led light as well as 3 years defect liability period for all other items free of

Read more
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026

Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise