Tender Details
Particulars | Details |
---|---|
Title |
Tn 5388 Measurement Of Various Parameter Of Esp Of Any One Unit Of Stage Ii (Unit 3 And 4 Of 210 Mw) During Running As Well As Shutdown Condition And Prepare And Submit Its Report.
|
Description |
Measurement Of Various Parameter Of Esp Of Any One Unit Of Stage Ii (Unit 3 And 4 Of 210 Mw) During Running As Well As Shutdown Condition And Prepare And Submit Its Report.
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1090 |
EMD | 12800 |
Tender Value | |
Place | Kota Super Thermal Power Station |
Link |
AAAAAAAAAA Login to view |
Start Date | March 20, 2025 17:30 |
End Date |
24/04/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Insulation of various area of boiler esp mills fan and turbine of various division bmd-i bmd-ii and tmd during overhauling of unit 9 dtps kasimpur
Insulation of various area of boiler esp mills fan and turbine of various division bmd-i bmd-ii and tmd during overhauling of unit 9 dtps kasimpur
Read moreTn-5388 measurement of various parameter of esp of any one unit of stage ii (unit 3 and 4 of 210mw) during running as well as shutdown condition and prepare and submit its report.
Measurement of various parameter of esp of any one unit of stage ii (unit 3 and 4 of 210mw) during running as well as shutdown condition and prepare and submit its report.
Read morePicking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Read moreAnnual contract for providing highly skilled manpower to assist in operational activities of various equipments of main plant area and machinery for unit 1, 2, 3 and 4, stage-i, phase-i and ii, chhabra thermal power project, chhabra
Annual contract for providing highly skilled manpower to assist in operational activities of various equipments of main plant area and machinery for unit 1, 2, 3 and 4, stage-i, phase-i and ii, chhabra thermal power project, chhabra
Read moreHiring of one no. mini bus 20 22 seater running in good condition for operation emergency duty of unit no 3 4 at ph ii sgtps mppgcl birsinghpur for period of 02 years
Hiring of one no. mini bus 20 22 seater running in good condition for operation emergency duty of unit no 3 4 at ph ii sgtps mppgcl birsinghpur&#x0d for period of 02 years &#x0d
Read moreProviding assistance in testing division work of electrical equipment during annual overhauling of unit no. 3 and 4, ph-ii, 2x 210mw, at sgtps, mppgcl, birsinghpur.
Providing assistance in testing division work of electrical equipment during annual overhauling of unit no. 3 and 4, ph-ii, 2x 210mw, at sgtps, mppgcl, birsinghpur.
Read moreSp.92 nctps-ii es circle em ii division sdn iii carrying out running maintenance works in unit i and ii of esp for period of one year up to 31 03 2026 from 01 04 2025 or from the date of taking over of site
Sp.92 nctps-ii es circle em ii division sdn iii carrying out running maintenance works in unit i and ii of esp for period of one year up to 31 03 2026 from 01 04 2025 or from the date of taking over of site
Read moreUnit ii time bound works at various locations of esp boiler 40 mtr turbine 0 mtr turbine 8 5 17 5 mtr and common locations such as cwph and raw water pump house
Unit ii time bound works at various locations of esp boiler 40 mtr turbine 0 mtr turbine 8 5 17 5 mtr and common locations such as cwph and raw water pump house
Read moreRcc repairs and protective coating of internal rcc prilling towers 11/31(any one unit only as per shutdown), at rcf thal.
Rcc repairs and protective coating of internal rcc prilling towers 11/31(any one unit only as per shutdown), at rcf thal.
Read moreTtps operation circle mpm ii unit-iv attending the coal chocking in unit-iv v hp 803 mill from mill discharge to boiler corner by using air during chocking of any mill after cutting the coal pipe at various length and lowering etc.,
Ttps operation circle mpm ii unit-iv attending the coal chocking in unit-iv v hp 803 mill from mill discharge to boiler corner by using air during chocking of any mill after cutting the coal pipe at various length and lowering etc.,
Read moreof your Industry type