Tender Details
Particulars | Details |
---|---|
Title |
Poking Of Silo Unloading Telescopic Chutes To Facilitate Smooth Unloading Of Ash From Silo Along With Poking Of Esp Aph And Silo Hoppers Of Unit 3 And 4 For 4 Months Under Ahp Operation Ii
|
Description |
Poking Of Silo Unloading Telescopic Chutes To Facilitate Smooth Unloading Of Ash From Silo Along With Poking Of Esp Aph And Silo Hoppers Of Unit 3 And 4 For 4 Months Under Ahp Operation Ii
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id | 2025_WBPDC_832355_1 |
Reference Number |
WBPDCL/SGTPP/NIT/E3354/24-25 |
Tender Fee | 0 |
EMD | 7612 |
Tender Value | |
Place | Adbuilding SGTPP P.O Manigram Dist Murshidabad |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1854490 |
Start Date | April 02, 2025 15:30 |
End Date |
21/04/2025 ( Expired 49 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreService part w.r.t installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house under ahp-mm, bktpp under capex 2025-26
Service part w.r.t installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house under ahp-mm, bktpp under capex 2025-26
Read morePhe/swsd/ee/niet- 07 of 2025-26 (sl.no. 01 )
Day to day operation and maintenance of 12 mgd 55.02 mld water treatment plant at fulbari, p.s. rajganj, dist. jalpaiguri for siliguri comprehensive water supply scheme under siliguri w/s division, p.h.e. dte.,for 12 months from 01.07.25 365 days
Read moreRectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 4 support columns in unit 4 esp to chimney 3 along east side of trench
Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe&#x0d rack pr 4 support columns in unit 4 esp to chimney 3 along east side of trench
Read moreHiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Read moreWork contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Work contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Read moreBiennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Read moreOperation and maintenance with comprehensive annual maintenance contract of ris stations under phase i from farakka to haldia in nw 1
Operation and maintenance with comprehensive annual maintenance of ris stations under phase i from farakka to haldia in nw 1
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreRepairs to otm and md accn along with petty repairs in 58 coy asc supply depot, asw, stn hq, silver stable, golden stable ancillaries and certain area of age b/r-ii under ge(n) ahilyanagar
Repairs to otm and md accn along with petty repairs in 58 coy asc supply depot, asw, stn hq, silver stable, golden stable ancillaries and certain area of age b/r-ii under ge(n) ahilyanagar
Read moreof your Industry type